My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC28871
DRMS
>
Back File Migration
>
Inspection
>
INSPEC28871
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:32:15 PM
Creation date
11/18/2007 10:18:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977326
IBM Index Class Name
Inspection
Doc Date
4/18/2005
Doc Name
Insp Rpt
From
DMG
To
Robinson Brick Company
Inspection Date
3/10/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 2) <br />MINE ID # OR PROSPECTING ID #: ~~-~ Qv~-'~~6 <br />INSPECTION DATE: 'i/]11/0.5 INSPECTOR' S INITIALS: KAP <br />OBSERVATIONS <br />This inspection was conducted as part of the 4-year monitoring program conducted by the Division of <br />Minerals and Geology. Present at the inspection were Kate Pickford and Harry Posey, DMG, Greg Knell <br />and Jason McGraw, Robinson Brick Company, and Brad Mueller, Siloam Stone, Inc. Weather at the <br />time of the inspection was clear, windy, and approximately 45 degrees. <br />2. A sign is posted at the entrance to the site and the boundaries are marked. The site is a joint venture <br />between Robinson Brick Company and Siloam Sfone, Inc. Siloam Stone is removing the upper, rock <br />layer from the mined area, and Robinson Brick is removing the underlying clay layer. The affected area <br />consists of a slot with a highwall along one side that is being mined, paralleled by a reclamation face <br />that Siloam Stone is backfilling as mining progresses. The reclamation slope originates on a pre-law <br />disturbed area, much of which has been backfilled and graded but still requires topsoil and seeding. <br />The reclamation face consists of a graded slope that will continue to be filled as the highwall progresses <br />along the direction of mining. <br />3. Stockpiled material that Robinson has excavated is located above the excavation on an adjacent <br />area that abuts the Pinion Mine -permitted by Siloam Stone. Activity at the site appears to fall within <br />the guidelines of the permit. The current bond amount of $28,000 appears to be adequate for <br />reclamation of the site. A partial bond calculation, however, will be conducted in order to confirm that <br />the amount is adequate. <br />I & E Contact Address <br />NAME: Mike Chalmers <br />OPERATOR: Robinson Brick Company <br />STREET: 1 A45 W Dnrtmnuth Ave <br />CITY/STATE/ZIP: f)anver CC) zim m-isna <br />Cc ^ CE <br />^ BL <br />^ FS <br />^ HW <br />D WMD (CH) <br /> SE <br />^ WOCD (CH) <br />X Other: Harry Posey, DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.