Laserfiche WebLink
I ~J <br />p4 ce`OR, COLORADO DIVISION OF MINERALS AND GEOLOGY <br />Nay, <br />~8 MINERALS PROGRAM INSPECTION REPORT <br />'.~: PHONE: (303) 866-356'7 <br />{,8,~ <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the <br />Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE <br />CORRECTIVE ACTION AND/OR RESPONSES TO THE DIVISION IN ORDER TO AVOID CONSIDERATION <br />OF POSSIBLE ENFORCEMENT ACTION BY THE MINED LAND RECLAMATION BOARD. <br />MINE NAME: Siloam Mine OPERATOR: Robinson Brick Company <br />COUNTY: <br />INSPECTOR(S): <br />MINE ID # OR PROSPECTING ID #: <br />110(21 <br />INSPECTION DATE; 3/10 /05 DATE OF COMPLAINT: NA <br />INSPECTOR'S INITIALS: KA P TIME OF DAY (MILITARY): 1030 <br />INSPECTION TYPE CODEItI: MI POST INSP. CONTACTSIZI: NO <br />JOINT INSP. AGENCY CODEl2j: NO REASON FOR INSP. CODEj31: IE <br />WEATHER CODEt4l: CR BOND CALCULATION TYPEISI: RP <br />OP. REP. PRESENT: Gree Knell, Jason McGraw, Brad Mueller <br />1. INSPECTION TYPE CODE - ICGIN: Il.rlllegal Operation, MI=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Pre-operation <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - ICL-AC: NO=None, BL=BLM, CH=Colo. Dept Health; CL=Land Board, <br />CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LC=Local Government, SE=State Engr.J <br />3. REASON FOR INSPECTION CODE - ICL-RS: AG=Other Agency Request, CT~itizen Complain[, IE=Norman&EProgram, HP=High Priority, PY=Priorityi <br />4. WEATHER CODE - ICL-WE: ClrCloudy, CR=Cleaq IN'=Inclement -prevented iaspertion, RN=Raining, SN=Snowing, WD=Windyl <br />5. BOND CALCULATION TYPE: -IBC=Complete Bond, BP=Partial Bond, NN=None) <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. IF PB <br />OR PV IS INDICATED. YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE <br />COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND REGULATIONS. If PV <br />is indicated, you will be notified under separate cover when the Mined Land reclamation Board will consider passible <br />enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... ~L (FN) FINANCIAL WARRANTY...... ~ (RD) ROADS................... <br />(HB) HYDROLOGIC BALANCE ............... (BG) BACKFILL & GRADING....... ~ (EX) EXPLOSIVES........... OtA_ <br />(PW) PROCESSING WASTE/TAILING...... r[A (SF) PROCESSING FACILITIES..... ~ (TS) TOPSOIL ................. IL <br />(MP) GENL MINE PLAN COMPLIANCE... ~ (FW) FISH & WILDLIFE ............... ]L (RV) REVEGETATION..... ~ <br />(SM) SIGNS AND MARKERS .................. Y (SP) STORM WATER MGT PLAN... Y (SB) COMPLETE INSP..... Y <br />(ES) OVERBURDEN/DEV. WASTE........... Y (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP... Y <br />(AT) ACID OR TOXIC MATERIALS......... N!1 (OD) OFF-SITE DAMAGE .............. YLA (ST) STIPULATIONS........ NA <br />Y =Inspected and Found io Compliance <br />N =Not Inspected <br />PV =Inspected and Passible Violations Noted PB =Inspected and Problems Noted <br />NA =Not Applicable <br />ORIGINAL- PUBLIC FILE <br />