Laserfiche WebLink
<br />Colorado Division of Minerals end Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT NOBILI ZATION / DEMOBILIZATION <br />Task p... 4 Prep. by CLK Filename..M112-4 <br />Date..... 09-Aug-96 Permit C M-82-112 Nine......Niller Pit <br />Permit Action........ Succession of Operator <br />Task Description..... Mob/demob <br />HOURLY EQUIPMENT COST <br />_____________________ NOTE - This is a list to select from, not a list of mandatory item, to include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GW, 375 NP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Mad, frailer 50 ton folding gooseneck, drop deck <br />-Nvy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gesoLine powered <br />-Nyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boom <br />-Fuel truck 6x4, 3,600 gallon capacity, 210 NP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 NP, diesel powered <br />-Flatbed Truck: 20,000 lb GVw, 175 HP, diesel powered <br />Lest Update: """'°"°'°°-------------- ----'-""'___ ________'°- °--'~~-_-__-- ---_-_-"" <br />December, 1994 <br />--------------- Lt. Rig Ned.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Cer Crane Truck Truck Truck <br />___________P __________________ <br />Ownershi Cost/hr 527.88 ________________________________ <br />f31.23 538.36 51.81 ______________ <br />519.89 ____________ <br />f6.95 _________________ <br />f12.79 __________ <br />f5.71 <br />Operating Cost/hr = f26.84 529.29 534.27 55.12 f23.40 f18.53 f24.52 f8.00 <br />Operator Cost/hr = 521.40 f22.03 522.03 521.24 f20.86 f21.24 f21.24 f21.24 <br />Helper Cost/hr = f20.60 521.24 521.24 50.00 50.00 f0.00 f0.00 f0.00 <br />Total = f96.72 5103.79 5115.90 528.17 564.15 f46.72 558.55 534.95 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- Yeight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr <br />________________ Lost/ea <br />__________ <br />_______________________________ <br />Cat D8N ________________________________ <br />40.00 E40.05 5103.79 ______________ <br />2 ____________ <br />f287.b8 _ <br />5207.58 <br />Revegetetion equipment 15.00 530.00 596.72 1 5126.72 596.72 <br />Subtotals f414.40 5304.30 f0.00 <br />