My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC28720
DRMS
>
Back File Migration
>
Inspection
>
INSPEC28720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:32:08 PM
Creation date
11/18/2007 10:17:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982112
IBM Index Class Name
Inspection
Doc Date
8/9/1996
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Tssk No.~ Task Description <br />sheet 4 of 4 <br />Cost (S) <br />Subtotal (K ): <br />------------ <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br /> Demolition ~ <br />3 ~ Seeding ~ f6, 890 <br /> Fencing <br />4 ~ Mob/Demob ~ f2, 027 <br /> Subtotal (M ): f8, 917 <br />TOTAL DIRECT RECLAMATION COSTS (subtot als A through N): 513,411 <br />I1. INDIRECT COSTS <br />____________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description <br />~~_________________________~_ <br />~ ~ <br />________________I~ Cost (f) <br />_~_________ <br />________I <br />1. ~ ___ <br />_ <br />Public Liability Insurance.... 1.550% of dir. ~ 5208 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5131 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 51,341 <br />4. ~ Job Superintendent.. <br />Subtotal (A ): (1,680 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f15, 091 <br />B. DNC PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (f) <br />__...___I__________________________________________________I____________ <br />1. ~ Minerals Prog rem Adnin. Fee at S.OOX of cnt r.~ 5755 <br />NET INDIRECT COST DERCENTAGE: 18.15% Subtotal (B): f755 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): fZ,434 <br />TOTAL PERFORMANCE BOND AMWNT (direct plus indirect costs): 515,846 <br />
The URL can be used to link to this page
Your browser does not support the video tag.