Laserfiche WebLink
• <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />N. EARTHNOF:K - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />________I_...-.__________________________~_________._____..I______._.._ <br />Subtotal (H): <br />____________ <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />________I__________________________________~______________I____________ <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />_____~_~__________________________________________________1____~____ <br />2 ~ Spread topsoil over 10 acre site ~ 52,636 <br />Subtotal (J): 52,636 <br />