Laserfiche WebLink
• (Page 4) <br />MINE ID / OR PROSPECTING ID ~ W-BZ-086 <br />INSPECTION DATE 3 1 96 INSPECTOR'S INITIA]:S ACS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be correctecl by the <br />dates given, or they will become possible violations. The possible violations etiould be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTION <br />DATE <br />1 <br />5 / 6 / 96 / <br />PB or PV PEA <br />TOPIC(S) SF_ <br />2 <br />5 / 6 / 96 ~ <br />PB or PV PB~_ <br />TOPIC(S) SM <br />3. <br />5 / 6 / 96 ~ <br />PB or PV PB_ <br />TOPIC(S) SF_ <br />4 <br />5 / 6 / 96 / <br />PB or PV PB_ <br />The Division has estimated reclamation costa for the TOPIC(S) FN_ <br />Fairplav Site at 5191,400.00 (a coat estimate ie attached <br />to the Operator's copy of this report). The Operator has <br />the following options: <br />al Provide a new bond, or rider to the existing bond, to <br />bring the total amount held to 5191,400.00 by 5/6/96. <br />bl Provide information that will demonstrate, to the <br />satisfaction of the Division, that a lesser bond amount <br />is appropriate. Such a demonstration would have to be <br />management and sediment control, and does not address <br />design elements or reclamation aspects of anv ditches, <br />berme, ponds, etc. that may be required. <br />