Laserfiche WebLink
- 4 - <br />E:.::: <br />.,,<;; -o This an- <br />ts wi a one on an appropriate num a ive sam- <br />ples criteria in consultation with the Regulatory Authority taken to <br />a depth of at least 4 feet, and will include an analysis of all re- <br />quired soil parameters for a determination of suitability for recla- <br />mation; if unsuitable, a reclamation plan must be developed. <br />6. Topsoil must be analyzed for fertilzer elements (N,P,K) prior to <br />seeding. If the soil is found to be phosphorous deficient, phos- <br />phorous must be incorporated into the topsoil during the respreading <br />process. Any other fertilizer elements which are deficiedt in the <br />topsoil may be added after one year's growth of vegetation at a time <br />of year approved by the Regulatory Authority. <br />8. The permittee will utilize combined McClave and Hunger pre--mine data <br />.. for productivity for [he.Greasewood, Shad scale and Juniper vegetative <br />_ communities respectively. This data shall be subject to the revege- <br />- -_~ -_" -- '=--tattds-succesrcri[eri~-o€k~~5--8~3~{b)-:~- _:_ _- r-~_ . <br />...:p.. ~. -- <br />10. <br />u:: <br />`~,~ <br />sample size, sample mean, sample variance, and level of confidence <br />achieved. __ _ <br />.., ire ._:. _ - <br />The permittee must provide within 90 days, justification to the•OS2i <br />and CMLRD for .the .woody plant density revegetation levels proposed. <br />OSM and CMLRD;will determine an acceptable level within 90 days of . <br />receipt of this data. ;:;__~_.. .. :.. .. r ._.. :... <br />12. within one year of permit issuance, the' permittee will develop and <br />obtain the approval of OStt and the CMLRD for a biennial revegetation <br />monitoring program which will monitor the success of revegetation ef- <br />forts at the t[cClane Canyon site, to be approved by the OS:I and C`1L4D <br />and implemented the second year after the initial revegetation seed- <br />ing. <br />13. During mining operations iE a previously unidentified cultural re- <br />sources site is discovered, the operator shall ensure that the site <br />is not disturbed and shall notify the regulatory authority. The op- <br />erator shall ensure that the resource(s) is properly evaluated <br />implementation by the permittee:.. __... ,. <br />