Laserfiche WebLink
- 10 - <br />I <br />Soils <br />No topsoil was stockpiled prior to the existing disturbance at the L1cClane <br />Canyon site. Future planned disturbances that will occur after permit issu- <br />ance will be the sediment pond and topsoil storage area. Topsoil will be <br />stripped from the area of the proposed sediment pond. Analyses indicated that <br />these soils are good sources for topsoil for use in reclamation of the mine. <br />The applicant proposes to strip the-Nihill Loam soil to a depth of 12 inches <br />and the Itivra Variant to a depth of 18 inches. This will yield a volume of <br />900 BCY of topsoil from the disturbed area. Part of this topsoil will be re- <br />spread over one acre of the mine bench and the rest will be spread over the <br />disturbed area of the sediment pond. These-soils will be respread at a mini- <br />mum depth of 4'. <br />A portion of the bench and outslopes along the reclaimed road will not be top- <br />soiled. These areas consist of fill which was used for grading the road and <br />original ground. The applicant has supplied a few analyses from grab samples _ <br />of this material. Although these analyses indicated that the material is <br />suitable for reclamation, it is insufficienC for the determination e: reclama- <br />tion feasibility. '-- - - - - <br />The information provided 'with respect to the fill is too limited in depth and <br />__`==--~ateet=of-sampi~n~-The eaterial will be-mixed and rearranged during the re- <br />grading process. For this: reason it is important that it be sufficiently <br />(; demonstrated that any material which may be exposed during the regrading pro- <br />cess is suitable for use as a plant growth medium and this stipulation is the <br />preferred alternative to assure compliance. - - <br />The applicant proposes to test the soil and add the appropriate fertilizers •_ <br />'~i'-' one year after seeding and planting. The applicant's justif ication for this <br />is that fertilization prior to seeding will encourage undesirable weedy spe- <br />__ ties to invade the reclaimed site. However, because phosphorous is relatively <br />' immobile and does not readily leach into the soil, it is best to incorporate - " <br />it into the soil prior to seeding and consequently stipulated in the preferred <br />alternative section. <br />The McClane Canyon site is located in an area that normally receives less than <br />10 Snches of rainfall annually. This may be detrimental to revegetation. For ' <br />this reason the surface manipulation of the soils is needed prior to seeding. <br />Contour furrowing would protect the soil from erosion as well as enhance water <br />holding capacity and availability to vegetation. Salt Creek Mining Company <br />plans to rough the surface in areas to be broadcast seeded but intends to - <br />grade other areas. See required stipulation regarding this in preferred al- <br />ternative, <br />Vegetation <br /> The :Sunger Canyon project contains the same vegetation types and is located <br /> contiguously to the tlcClane Canyon site. Abl.otic factors affecting the occur- <br />~~ rence of vegetation communities ar e similar. For this reason, data from the <br /> two sites for productivity of the above communities were compared to deternine <br /> if the conmunLtles of `ScClane and :lunger Canyon were from differing popula- <br />