Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person MOUNTAIN COAL CO. Number C-007-80 Date 08/18/2004 Continuation Page <br />28. <br />3=Not <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. ~ Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and ConVOI <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees -- Non-Respondent <br />$. 1 ANII. Rec. Fees -- Failure to Pay <br />B. Hy drologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8. ~ Surface Water Monitoring <br />9. 3 Drainage -- Acid-Toxic Materials <br />10. 1 Impoundments <br />11. 1 Stream Buffer Zones <br />C. To psoil & Subsoil <br />1. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />Performance Standard Categories <br />Ptanned, 4=Not Started, S=Noncompliance Iden&fied Elsewhere, 6=Previously Cited <br />D. Backfilling & Grading ~ g, 1 Subsidence Control Plan <br />1. 1 Exposed Openings I. Roads <br />2. 1 Contemporaneous Reclamation 1. I Road Construction <br />3. 1 Approximate Original Contour 2. 1 Certification <br />4. 1 Highwall Elimination 3. I Drainage <br />5. 1 Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6. 1 Handling of Acid & Toxic Materials 5, 1 Reclamation <br />7. 1 Stabilization (rills and gullies) J, Signs & Markers <br />E. Excess Spoit Disposal 1. 1 Signs <br />1. 3 Placement 2. 1 Markers <br />2. 3 Drainage Control g, 1 Distance Prohibitions <br />3. 3 Surface Stabilization L. Revegetation <br />4. 3 Inspections & Certifications 1 <br />1._ Vegetative Cover <br />F. Coal Mine Waste 2. 1 Timing <br />(Refuse Piles/Impoundments) <br />1 M. 1 postmining Land Use <br />Drainage ConVOI <br />1. <br />2. 1 Surface Stabilization N. Other <br />3. 1 Placement General <br />4. 1 Inspections and Certifications Performan ce <br />5.~ Impounding Structures Category <br />G. Use Of Explosives 1) <br />1. 3 Blaster Certification _ <br />2. 3 Distance Prohibitions 2) <br />3. 3 B1astSurvey/Schedule _ <br />4. 3 Warnings & Records 3) <br />5. 3 Control of Adverse Effects _ <br />A. <br />B. <br />I <br />I <br />C. <br />D <br /> <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br /> A d ministrative .................................. ....................................... <br />1. Vatid Perntit ....................._..__._............._... ..................................773.11 <br />2. Mining within $onded Area .................. ..............................773.] 1 <br />3. Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Con[rol .......................... ..............................778.13 <br />6. Temporary Cessation ..................._......... 842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondent ....... .........................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br />Hydrologic Balance ........................... ...........(816/817.41-57) <br />1. Drainage Control .................................... .....................................45 <br />2. Inspections & Certi£cations ................... ..........................49(a)(10) <br />3. Siltation Structures ................................. .....................................46 <br />4. Dischazge Structures .............................. .....................................47 <br />5. Diversions .............................................. .....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7. Ground Water Monitoring ...................... ................................41(c) <br />8. Surface Water Monitoring ...................... ................................41(e) <br />9. Drainage--Acid-Toxic Materials ........... ...._......._.................41(0 <br />0. Impoundments ........................................ ....................................49 <br />1. Stream Buffer 2ones .............................. .....................................57 <br />Topsoil &Subsoil ...............................................(816/817.22) <br />1. Removal .......................................................... ........................22(a) <br />2. Substitute Materials ........................................ .........................22(c) <br />3. Storage and Protection .............._..........._._.... .............._.........22(c) <br />4. Redistdbution ................................................. .........................22(d) <br />Backfilling & Grading ........................... ...(816/817.95-107) <br />1. Exposed Openings .....................816/817.13, 1 4, I5, & 823.1 I & 21 <br />?. Contemporaneous Reclamation ....................... ...........................100 <br />3. Approximate Original Contour ........................ ..................102(a)(1) <br />. Highwall Elimination ....................................... ..................102(a)(2) <br />. Steep Slopes (includes downslope) .................. ..........................107 <br />. Handling of Acid & Toxic Materials.._ ............ ......................102(c) <br />. Stabilization (rills and gullies) .......................... 4 <br />5 <br />6 <br />........................95(6) <br />7 <br />E. Excess Spoil Disposel ...........................................(816/817.71-74) <br />I. Placement ...........................................................................................71(e) <br />2. Drainage Control ..................._.._.......................................................71(0 <br />3. Surface Stabilizerion ...........................................................................71(g) <br />4. Inspections &Certifications ...................................._.........................71(h) <br />F. Coal Mine Waste (Refuse Piles/tmpoundments) ,,,,,(g16/817.81-84) <br />I. <br />2. <br />4. <br />5. <br />G. <br />1. <br />2. <br />3. <br />4. <br />5. <br />H <br />I. <br />Drainage Control ........................... <br />Surface Stabilization ............._._..... <br />Placement ....................................... <br />Inspections and Certifications_._.... <br />Impounding Snucmres........_._...._. <br />.. _ ............... _............ _. _....... _..83 (a) <br />.................................................83 (b) <br />.................................................83 (c ) <br />................................................83 (d) <br />.....................................................84 <br />Use of Explosives ..................................................(816/817.61-68) <br />Blaster Certification.. _ ..................................... ..................................61(c) <br />Distance Prohibitions ....................................... ..................................61 (d) <br />Blast Survey/Schedule.........._...._ ................... ..................................62-64 <br />Warnings & Records ....................................... ...............................66 & 68 <br />Control of Adverse Effects .............................. .......................................67 <br />Subsidence Control Plan .........................................(817.121-122) <br />Roads ................................................................. (816/817.150.151) <br />1. Road Constmction ...........................................................................150(c) <br />2. Certification ......................................................................................151(a) <br />3. Drainage ...............................................................................150(6)-151(d) <br />4. Surfacing and Maintenance ..................................................150(e)-151(d) <br />5. Rec]amation ......................................................................................150(0 <br />J. Signs & Markers .......................................................(816/817.11 <br />1. Signs ................................................_...................................11(a),(b),~(c) <br />2. Markers ............................._.......................................11(a),(b),(d),(e),&(0 <br />K. Distance Prohibitions .......................................................(761.11) <br />L. Revegetation .....................................................(816/817.111-116) <br />1. Vegetative Cover .......................................................................111 & 116 <br />2. Timing ..................................................................................................113 <br />M. Postmining Land Use ..............................................(816/817.133) <br />Re.iaed Decanter a, 1998 Page 2 of <br />