Laserfiche WebLink
• (Page 4) <br />MINE ID t/ OR PROSPECTING ID Jl M-1977-020 <br />INSPECTION DATE 3-30-2001 <br />INSPECTOR'S INITIALS SSS <br />The following problems IPBI and/or possible violations (PV) land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Several deviations from the approved permit specifications were noted during this 5-15-2001 <br />inspection and are noted in the foregoing report. PB or PV: PB <br /> TOPICISI: AR <br />CORRECTIVE ACTION: SF , RS , FN <br />For those items that will not be corrected on the ground by the correction date noted MP , ES , _, <br />to the right please submit an application for revision addresses incorporation of the <br />changed site conditions and operational plans into the approved permit. The revision <br />must be received by the correction date and must address specific deviations from <br />the approved permit for each of the items detailed in the body of this report such as <br />the revised configuration and dimensions of the highwalls, the two (or morel bench <br />mining method, the increased maximum disturbances, the lack of contemporary <br />reclamation, the new and unauthorized asphalt plant, the lack of (or re-disturbance <br />ofl reclamation on the west parcel, the revised topsoil/overburden stockpile location, <br />and the increase in reclamation costs due to these changed conditions. <br />2. Several large diesel fuel tanks were noted throughout the site that were not placed 4-30-2001 <br />within adequate spill containment structures. PB or PV: PB <br />TOPICISI: AT <br />CORRECTIVE ACTION: HS , _, _ <br />Either remove all of these tanks from the permit area and submit photographic <br />documentation of compliance with this corrective action, or submit a revision <br />application addressing incorporation of specifications for construction and <br />reclamation of adequate spill containment structures for these tanks. <br />3. The six nesting boxes that were to be installed in 1998, on the north side of the west 5-15-2001 <br />pond, have not yet been constructed. PB or PV: PB <br />TOPICISI: FW <br />CORRECTIVE ACTION: _, _, _ <br />Please construct these nesting boxes and submit photographic documentation of <br />compliance with this corrective action. <br />4. The topsoil/overburden berm on the south side of the Amendment No. 1 parcel does 5-15-2001 <br />not support an adequate vegetative cover. PB or PV: PB <br />TOPICISI: TS <br />CORRECTIVE ACTION: RV , _, _ <br />Submit fertilizer recommendations, perform revegetation tasks, including fertilization <br />according to analysis recommendations and submit photographic documentation of <br />compliance with this corrective action. <br />