• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-1977-020 <br />INSPECTION DATE 3-30-2001 <br />INSPECTOR'S INITIALS SSS <br />The topsoil/overburden berm on the south side of the Amendment No. 1 parcel does not support an adequate vegetative <br />cover though it has been in place since early 1998. This permanent berm must be revegetated to stabilize against erosion <br />and weed infestation. The operator has committed to providing DMG with fertilizer recommendations resulting from topsoil <br />sample analysis. Please, by the correction date noted on the next to last page of this report, submit these fertilizer <br />recommendations, perform revegetation tasks, including fertilization according to analysis recommendations and submit <br />photographic documentation of compliance with this corrective action, <br />The highwall on the north side of the Amendment No. 1 parcel appears to have encroached slightly closer to the <br />landowners north fence than the fifty foot buffer allows. Please, by the correction date noted on the last page of this <br />report, conduct final grading of the portions of this highwall that have encroached upon the 50 foot buffer, take measures <br />to ensure that no future encroachment occurs and submit photographic documentation of compliance with this corrective <br />action. <br />It appears that portions of the south and north pit slopes in the west pond are not at the approved final grade as indicated <br />in the Amendment No. 1 application file. The current reclamation cost estimate assumes that these slopes are at the <br />approved final grade. Please, by the correction date noted on the next to last page of this report, verify the grades of these <br />slopes and perform any regrading required to bring them into compliance and submit photographic documentation of <br />compliance with this corrective action. <br />The north, east and south sides of the west parcel are for the most part devoid of vegetation though these areas were to <br />be revegetated a few years ago and were not included in the current reclamation cost estimate. Please, by the correction <br />date shown on the next to last page of this report, complete the reclamation tasks on these areas as approved and submit <br />photographic documentation of compliance, or submit a revision application addressing incorporation of revised mining and <br />reclamation plans and reclamation costs for the mining operations currently taking place. <br />Responses to this inspection report should be directed to Steve Shuey at the Division's Durango Field Office. The address <br />is; Division of Minerals and Geology, 701 Camino del Rio, Room 125, Durango, Colorado 81301, phone no. 970-247-5062. <br />I & E Contact Address <br />NAME <br />OPERATOR <br />STREET <br />CITY/STATE/ZIP <br />Richard Johnson <br />United Companies of Mesa Countv Inc. <br />P. 0. Box 3609 <br />Grand Junction. Colorado 81502 <br />cc: Tom Gillis, DMG <br />^ CE -Randy Snyder - G. J. Office <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD ICHI <br />^ SE <br />^ WOCD ICHI Susan Nachtrieb -Denver <br />^ OTHER <br />