Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are particular issues with regard to any of the above compliance items. Enforcement <br />actions resulting from failure to comply with the Act, Rules and Regulations, and the permit <br />also are identified below. <br />Availability of Records (5.02.4) <br />1. An apparent inconsistency was noted in the number of parameters analysed for pond <br />discharges. <br />Backfilling and Grading (4.14) <br />Z. The drainage problem noted in the September inspection report has been alleviated <br />as additional material has been placed in this area. <br />Support Facilities not Located at the Mine Site (4.28) <br />1. No perimeter markers were in place at the east end of the Zoadout. <br />