Laserfiche WebLink
(Page 3) <br /> MINE ID # OR PROSPECTING ID #: M-1977-119 <br /> INSPECTION DATE: 808/0() INSPECTOR'S INITIALS: lc� <br /> The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br /> inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible violations <br /> should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The <br /> inspector noted on the previous page should be notified of all corrective actions taken. <br /> PROBLEMS/POSSIBLE VIOLATIONS <br /> AND <br /> CORRECTIVE ACTIONS <br /> CORRECTION <br /> DATE <br /> 1. There is evidence of significant erosion of some of the reclaimed surfaces of the pit. Prig fo any <br /> utur—fit for <br /> release of <br /> reclamation bond <br /> and responsibility <br /> PB or PV: PB <br /> TOPIC(S): —ES- <br /> SC <br /> ihereclaimed surlaces ot the site must e stabilized and meetthe requirements ot C.K.S. - — — — <br /> (4) (I) in order that the Division be able to approve a request for release of reclamation bond and <br /> responsibility. <br /> 2. The vegetative cover on the reclaimed slopes is limited but appppears established. It does not, however, PH& ,(o any <br /> currently meet rec ama ion pe ormance s an ar s a ough me s�Fias, reportedly, een seeded future request for <br /> several times. <br /> release of <br /> reclamation bond <br /> and responsibility <br /> PB or PV: PB <br /> TOPIC(S): R5. <br /> RV <br /> The vegetative cover must develop to a greater degree and meet the requirements of C.R.S. 34-32.5 — — — <br /> 116(4)(0 in order that the Division be able to approve a request for release of reclamation bond and <br /> responsibility. (It is possible that only some additional time is required for the vegetative cover to develop <br /> to the required extent and degree.) <br /> 3. <br /> PB or PV: <br /> TOPIC(S): <br />