Laserfiche WebLink
maintenance work along the conveyor and above the large culvert to the east remains to be <br />completed. <br />Develooment Waste <br />The development waste pile was traversed on foot. Material cleaned from pond 8 is <br />stockpiled on the remaining area of the pile and will be spread and compacted when it dries <br />sufficiently. Vegetation on reseeded portions of the pile remains dormant due to dry <br />conditions and cool soil temperatures. <br />Overall, the site appeared in good condition and no problems were noted <br />