Laserfiche WebLink
JRN 23 '98 03~27PM DMG DURRNGO FIELD OFFICE <br />y ` <br />RECLAMATION COST CALCULATIONS <br />WEST END GRAVEL COMPANY - WEST END GRAVEL PIT <br />Permit Number M-94-O1 I <br />MOBII,IZATION/DEMOBILIZATION = <br />RIPPING PIT FLOOR AND SLOPES <br />i 9.9 acres to a depth of 1 foot = 15,972 cu. yds. @ $ .28 = <br />REGRADING PIT FLOOR <br />9.9 ACRES AT 1% SLOPE <br />40 hours of scraper time @ $100.00 = <br />TOPSOIL REPLACEMENT ON 12.3 acres <br />(9.9 acres x 43,560 sq. ft./acre x .5 ft of fOpsoil] - 27 sq. ft_/cu. ft. _ <br />7,986 cu, ft. of topsoil replaced @ $':86 = <br />REVEGETATION OF 12.3 ACRES <br />9.9 ACRES @ $600.00 = <br />SUBTOTAL = <br />i <br />DMG OVERHEAD @ 5.0% <br />PROJECT MANAGEMENT COSTS @ 18.5% <br />GRAND TOTAL = <br />Or an additional $23,620.00 <br />P.6i6 <br />$ 2,800.00 <br />$ 4,472.00 <br />i <br />$ 4,000.00 <br />$ 6,868.00 <br />$ 5,940.00 <br />$24,080.00 <br />$ 1,204.00 <br />$ 4,334.00 <br />$29,6]8!00 or <br />$ 29,62000 <br /> <br />