Laserfiche WebLink
JRN 23 '98 03~27PM DMG DURRNGO FIELD OFFICE <br />~ 1• <br />(Page 4) <br />P.Si6 <br />MINE ID # OR PROSPECTING ID #: M-94-01 l; West End Gravel Pit <br />INSPECTION DATE: February 24, 1997 INSPECTOR'S 1MTIALS: crnf <br />The following problems (PB) and /or possible violations (PV) (and suggested corrective actions) <br />were identified during this. inspection. The problems should be corrected by the dates given, or <br />they will become possible violations. The possible violations shbuld be corrected by the dates <br />given to reduce their severity when considered by the Mrned Land Reclamation Board. The <br />inspector noted on the from page should be notified of all corrective actions taken. <br />i PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Affected areaway be greater than permitted acreage. 4/07/97 <br />Please survty to determine actual affected area. ~~ PB or PV <br />TOPICS: MP; SM; OD <br /> <br />2. The existing $6,000.00 Financial Warranty is inadequate 5/05/97 <br />for the State to complete reclamation. Please submit an additional PB or PV <br />523,620.00 in Financial Warranty within 60 days. However, if TOPICS: FN <br />the site survey indicates that the affected land exceeds 9.9 acres, <br />the additional amourn of Financial Warranty required will need to <br />be recalculated. <br />3. Topsoil stockpile is.not vegetated. Fall, 1997 <br />Revegetate topsoil stockpile. PB or PV <br />TOPICS: TS <br />4. Chemical vessels are stored on site without containment ~/OS/97 <br />structures. Please propose permit conditions/ PB or PV <br />containment plans to protect groundwater. TOPICS' MP; HB <br /> <br />