Laserfiche WebLink
. This was a partial inspection conducted by Jim Burnell of CDMG on of Wednesday, May 7, <br />2002. This site itself was busy. The inspection was accompanied by Kathy Welt of Oxbow <br />LLC. <br />Work had started already on the corridor for the temporary conveyer. The approval had <br />been delivered the previous afternoon. We reviewed the approved corridor, with flagging in <br />place. Work was also proceeding on the permanent conveyer. Holes (shafts) had been <br />prepared the hardware was being assembled. The schedule for completion of the <br />permanent conveyer is September of this year. <br />_~` ~ .wwwY :Tlil_ <br />4 `. ~~ <br />.4 ;,, ~ t .~, ~; . <br />Coal waste was being emplaced in the West Valley fill. A sheepsfoot roller was on site <br />compacting the material as it was emplaced and spread. We discussed the drainage of the <br />clear water ditch from above the fill and the Oxbow stall will work on a satisfactory solution to <br />the routing of the south limb of the ditch acrosslaround/past the access road. Design work <br />will soon begin on a waste pile location to succeed the current West Valley fill. <br />Material has not been spread on the east yard gob pile. It had been piled there, but has <br />been awaiting drying before it was spread. <br />The road up to the drill sites was in very good condition. We discussed the ultimate <br />disposition of that road. It was apre-existing road, but the USFS wants it to remain. We <br />discussed the possibility of installing some permanent drainage features on this light-use <br />road if it is to remain in perpetuity. <br />The borrow area was stable, with just some minor sloughing of material. <br />