Laserfiche WebLink
<br /> <br />(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-1gg1-n~~ <br />INSPECTION DATE: Q~~g~~sr i5, ~nm <br /> <br />INSPECTOR'S INITIALS: inaa <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMSfPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The existing $5,000.00 bond is insufficient to complete reclamation per the approved plan. Pua~uant` to <br />Notice <br />PB or PV: <br />TOPIC(S): <br />~0 4.2. (2) will be mailed to the oRerator within the next few days. The operator will have sixty (601 <br />2. <br />/ / <br />PB or PV: <br />TOPIC(S): <br />3. <br />/ / <br />PB or PV: <br />TOPIC(S): <br />