My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC26487
DRMS
>
Back File Migration
>
Inspection
>
INSPEC26487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:57 PM
Creation date
11/18/2007 10:05:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Inspection
Doc Date
6/26/1994
Doc Name
COMMENTS ON INSPECTION REPORT FOR PIKEVIEW QUARRY PN M-77-211
From
MARK A HEIFNER
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mark A. Heffner, Plant Ecologist veger~t;on ~;"~ <br />37 East Colorado Avenue Land mclemat;an planning <br />Denver, CO 80210 v;e~at impart anaiyaia <br />(303) 722-9067 (Voice and Fas) Documentary photography <br />July 26, 1994 <br />Jim Dillie f~Ft^'F~~iFn <br />Division of Minerals and Geology 26 1994 <br />Rm 215 Centennial Bldg. ~~~ <br />1313 Sherman St. <br />Denver, CO 80203 t ~,~~u,~c,i~ w ~.idieiaa a u~~'•0~y <br />RE: Comments on inspection report for Pikeview Quarry. <br />Permit # M-77-211 <br />Dear Mr. Dillie: <br />Rick Paraday at Castle Concrete passed on to me copies of the inspection reports for Pikeview <br />and Queens. Apparently he has not received a report on Snyder yet. After reviewing the <br />reports I found a few items on Pikeview that requve some clarification. Following are our <br />comments on those items. All of the comments regard your statements with respect to Area H. <br />• 1. You state that "... curtently, a portion of Area H is being mined ..." <br />Comment: Although mining is occurring within the area called Area H as defined in <br />the amendment, this mining is occurring consistent with the existing permitted plan rather than <br />the new plan. Under the current plan the area being mined is to be excavated to about the same <br />level as the plant to the east. That has been achieved and the mining is now extending <br />southward. It could be construed from the inspection report that Castle is proceeding with the <br />amended plan. I'm sure you did not mean that, but it was felt this needed to be clarified. <br />2. You state that Castle will "... mine Area H to a depth of about 150 feet ..." <br />Comment: Although this is a fine point and probably of little significance, it should be <br />noted that Area H will be mined to a maximum depth of about 150 feet. A large portion of <br />Area H will be mined to a depth somewhat less than 150 feet. <br />iii iiiiiiiiiiiu iii <br />sss <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.