My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC26263
DRMS
>
Back File Migration
>
Inspection
>
INSPEC26263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:44 PM
Creation date
11/18/2007 10:04:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Inspection
Doc Name
OSM Inspection Report
Inspection Date
2/8/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person TRINIDAD BASIN Number C-81-04$ Date 02/0$/2000 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />A. Administrative <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure [o Pay <br />B. Hyd rologic Balance <br />1. _ Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Structures <br />4. _ Discharge Structures <br />5. _ Diversions <br />6. _ Effluent Limits <br />7. _ Ground Water Monitoring <br />8. _ Surface Water Monitoring <br />9. _ Drainage -- Acid-Toxic Materials <br />10. _ Impoundments <br />11. _ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. _ Removal <br />2. Substitute Materials <br />3. _ Storage and Protection <br />D. Backtilling & Grading H. <br />Subsidence Control Plan <br />1. _ExposedOpenings _ <br />I. Roads <br />2. _ Contemporaneous Reclamation Road Construction <br />1. <br />3. _ Approximate Original Contour _ <br />2. Certification <br />4. _ Highwall Elimination 3._ Drainage <br />5. _ Sleep Slopes (includes downslope) q,_ Surfacing and Maintenance <br />6. _ Handling of Acid & Toxic Materials 5. Reclamation <br />7. _ Stabilization (rills and gullies) J. Signs & Markers <br />E. Excess Spoil Disposal 1._ Signs <br />I. _ Placement Markers <br />2. <br />2. _ Drainage Control - <br />K. Distance Prohibitions <br />3. ^ Surface Stabilization -- <br />L. Revegetation <br />4. _Inspections & Certifications 1. <br />Vegetative Cover <br />F. Coal Mine Waste _ <br />Timing <br />2• <br /> (Refuse Piles/Impoundments) - <br />M. <br />Postmining Land Use <br />1. _ Drainage Control _ <br />2. Surface Stabilization N. Other <br />3. Placement General <br />4. _ Inspections and Certifications PerfOrfilanCB <br />5. _ Impounding Structures Catagory <br />G. Use Of Explosives A 1) gorfeiture evaluation - <br />1 a Blaster Certification _ <br />2. _ Distance Prohibitions 2) <br />3. _ Blast Survey/Schedule _ <br />4. _ Warnings & Records 3) <br />5. Control of Adverse Effects - _ <br />A. <br />B. <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br /> Adtninistrative .................................. ....................................... <br />1. Valid Pemut ................................................... ..................................773.11 <br />2. Mining within Bonded Area .................. ..............................773.1 ] <br />3. Terms & Conditions of Perini[ ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Con[rot .......................... ..............................778.13 <br />6. Temporary Cessation .............................. 842.11(e) & 816/817.131 <br />7. AML Rec, Fees -- Non-RespondenL ...... ..........._............87615(6) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br />Hydrologic Balance ......................................(816/817.41-57) <br />1. Drainage Control .................................... .....................................45 <br />2. Inspections & Certifications....._._........ _....._........ _. _.....49(a)(10) <br />3. Siltation Stmctures ................................. .....................................46 <br />4. Discharge Structures ............................. ......................................47 <br />5. Diversions .............................................. .....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7. Ground Water Monitoring ...................... ................................41(c) <br />8. Surface Water Monitoring ..................... .................................41(e) <br />9. Drainage--Acid -Toxic Materials .......... ........................_.......41(t) <br />10. I mpoundmen ts ....................................... .....................................49 <br />11. Stream Buffer Zones .............................. .....................................57 <br />C, <br />D. <br /> <br />Topsoil & Snbsoil ...............................................(816/817.22) <br />1. Removal ............................................................ ......................22(a) <br />2. Substitute Materials ................................_._...... ......................22(c) <br />3. Storage and Protection ...................................... .......................22(c) <br />4. Redistribu[ion .................................................... ......................22(d) <br />Backfilling & Grading .............................. (816/817.95-107) <br />I. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 <br />?. Contemporaneous Reclamation .......................... ........................100 <br />i. Approximate Original Contour ........................... ...............102(a)(1) <br />. Highwall Elimination ......................................... ................102(a)(2) <br />. Steep Slopes (includes downslope) .................... ........................107 <br />. Handling of Acid & Toxic Materials .................. ....................102(c) <br />. Stabilization (rills and gullies) ............................ 4 <br />5 <br />6 <br />......................95(6) <br />7 <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Control ................................................... .............................71(f) <br />3. Surface Stabilization._ ........................................... .............................71(g) <br />4. Inspections &Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse PilesQmpomdmeuts) ,,,,,(g16/817.81-84) <br />1. Drainage Control ................................................... ............................83(a) <br />2. Surface Stabilization .............................................. ........._........_.......83(6) <br />3. PlacemenL ........................._................................... ........_..................83(c) <br />4. Inspections and Certifications ................................ ...........................83(d) <br />5. Impounding S[ructures ........................................... ..........................._...84 <br />G. Use of Explosives ..................................................(816/817.61-68) <br />1. BlasterCerti£ca[ion....._ ......................................... ...........................61(c) <br />2. Distance Prohibitions ............................................. ............................61(d) <br />3. Bast Survey/Schedu]e ............................................ ...........................62-64 <br />4. Warnings & Records .............................................. ........................66 & 68 <br />5. Control of Adverse Effects..._ ................................ ................................67 <br />H. Subsidence Control Plan .............................. ...........(517.121-122) <br />I. Roads ............................................................. ....(816/817.150-151) <br />1. Road Construction .................................................. .........................I50(c) <br />2. Certiftcation ............................................................ ..........................151(a) <br />3. Drainage ................................................................. ......._.....150(6)-]51(d) <br />4. Surfacing and Maintenance ......................._........_. ..............750(e)-751(d) <br />5. Reclamation ............................................................ ..........................150(1) <br />J. Signs & Markers .......................................... .............(816/817.11) <br />1. Signs ....................................................................... ..............l l(a),(b),&(c) <br />2. Markers.._ .............................................................. ....11(a),(b).(d).(eb&(fl <br />K. Distance Prohibitions ................................... ....................(761.11) <br />L. Revegetation ................................................. ....(816/817.111-116) <br />1. Vegetative Cover .................................................... ...................1 l I & 116 <br />2. Timing .................................................................... ..............................1t3 <br />M. Postmining Land Use ................................... ...........(816/817.133) <br />2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.