Laserfiche WebLink
<br />(Page 3) <br />u <br />MINE ID # OR PROSPECTING ID # M-7B-014 <br />INSPECTION DATE 05/27/99 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The diesel fuel lank does not have any kind of containment around it to prevent June 18, 1999 <br />spills. This is in contradiction of Rule 3.1.9 and 3.1.8 of the Construction PB or PV PB <br />Materials Rules and Regulations. CORRECTIVE ACTION: Install some form TOPIC(S) HB <br />of spill control around or below the diesel tank, and send proof of same (photos) <br />to DMG by June 18, 1999. <br />2. <br />3. <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />