Laserfiche WebLink
<br />RECLAMATION COST SUMMARY con[~d <br />H. EARTHWORK <br />Task No.~ <br />STREAM CHANNEL RECONSTRUCTION <br />Task Description <br /> <br />sheet 3 of 4 <br />Cost (E) <br />Subtotal (H): <br />I. EARTHWORK <br />Task No.~ <br />________I______ <br />DRAINAGE CONTROL SYSTEM INSTALLATION/RENOVAL <br />Task Description ~ Cost (E) <br />Subtotal (I ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />__________________________________________________________I___________ <br />7 ~ Respread 7210 cu.yd. topsoil a E0.40/tu.yd. ~ E484 <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />_______________________________________________________________________ <br />Subtotal (J ): E484 <br />