My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25738
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:16 PM
Creation date
11/18/2007 10:01:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982141
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/29/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Soft ware <br />BULLDOZER WORK <br />' - ~ ~. ~ ,v....'~+. .. <br />r <br />ROJECT IDENTIFICATION <br />Agency or organization name : Divimbn Ot Minerals & Geology <br /> <br />Task» : 003 State :Colorado PenniUobp : M-82.141 <br />Dale : 72/29/99 County :Moffat Abbrevial~on :none <br />User: TAS Site :Juniper Limestone Quarry Filename:M/41-003 <br /> <br />Permit or other job action :Final Reclamation <br /> <br />Task description :Waste Pile : 4.5 acre•leet al finish grading <br /> <br />tDDRLY EQUIPMENT COST Basic machine : CaI D6N (1996) Horsepower : 2B5 <br />Blade type :Semi-Universal <br />Anachmenl no. 1 : ROPS Cab Shin basis' 1 per day <br />Anachmenl no. 2 : NA <br /> Utilization % Cost data source: (CRG) <br />Cost Breakdown, Ownership cosVhour. $35.17 NA <br />Operating cosVhour: $55.64 100 <br />Ripper op. cosUhour: $0.00 NA <br />Operator cosVhour: $23.72 NA <br />Total unit cosVhour: $113.93 Total flee) cosVhour: $113.93 <br />MATERIAL QUANTITIES <br />Initial <br />volume: 7.260 CCY <br />Swell <br />factor: 1.115 <br />Source of quantity take~on <br />Source of ast swell factor <br />Average push distance : 150 feet <br />Unadjusted hourly production: 597 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gratlient. 200 %(negJ <br />Average site altitude: 5,000 feet <br />Malenal weight : 2, 100 Ibs/LCV <br />Material weight description <br />Earth Loam <br />Loose <br />volume: 8,095 LCY <br /> <br />Operator skill: <br />0.75 Source <br />(avg.J <br />Material consistency: 0.90 (Cat HB <br />Dozing method: 1.20 (Slot) <br />Visibility: 1.00 /avg.) <br />Job efficiency 0.63 (1shiWda <br />Spoil pile. 0.70 (lnd~mlJ <br />Push gmd~enl . 1.05 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Matedal weight 1.10 (Cat HB <br />Blade type : 1.00 /S or U, <br />Net correction : 0.54 <br />Adjusted unit production : 318.52 LCY/hr <br />Adjusted Ilaet production : 318.52 LCV/hr <br />JOB TIME AND COST <br />Fleet size : <br />/ <br />Dozers) <br />Total lob time . <br />25.41 Hours <br />Unit cost : $0.358 /LCY Total joD cost : $2,895 <br />
The URL can be used to link to this page
Your browser does not support the video tag.