My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25738
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:25:16 PM
Creation date
11/18/2007 10:01:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982141
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/29/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost EstlmatinD SoHWa}e <br />BJU .LDOZHR WORK <br />{. <br />PROJECT IDENTIFICATION <br />Agency or organization name :Division O/Minerals & Geology <br />Task u : 002 State :Colorado PenniUjoba : M-82-141 <br />Dale : /Z'29/99 County : Motlal Abbreviation :none <br />User: TAS Site:Juniper Limestone Quarry Filename :M141-002 <br />Permit or other joD action : Final Reclamation <br />Task description :Reduce 500 L.F. 0140' highwell; 0.5: i to 2:1 slope <br />HOURLY EQUIPMENT COST Banc machine: Cal D9N (1995) Horsepower: 370 <br />Blade type ~ Semi-Universal <br />Anachment no. 1 . ROPS Cab Shah Dasis : 1 per day <br />Ahachment no. 2 : NA <br />Cost Breakdown, Ownership cosUhour: 534.22 <br />Operating cosVhour: Se 1.00 <br />Ripper op. cosVhour: $0.00 <br />Operator cosUhour: 323.72 <br />Total unit cosUhour: 5138.34 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 5,555 CCY factor <br />Source of quantity take-off'program <br />Source of est. swell lector :pmg2m <br />Utilization % Cosl data source : (CRG) <br />NA <br />100 <br />NA <br />Total fleet cosUhour. $276.66 <br />Loose <br />1.345 volume: 7,471 LCY <br />Average push distance : 500 feet Source <br /> Operetor skill: 0.75 (avg.J <br /> Material consistency : 1.00 (Cal RBJ <br />Unadjusted hourly production : 327 LCY/hr Doxing method : I.00 (gen.l <br /> Vtsib~liry: 1.00 (avg./ <br />Material consistency tlescdption: Job efficiency: 0.83 (1sh~IVday <br />Consolidated smckpJe Spoil pile : 0.80 (Ind~d) <br /> Push gradient: 0.86 (Cal HB) <br />Average push gradient : 700 °~o (pos) Altitude : 1 00 (Cal RB) <br /> Material weight : 0.88 (Cal HB) <br />Average site altitude . 5,000 feet Blade type . 1.00 /S or UJ <br /> <br />Material weight . 2.600 Ibs/LCY Net correction . 0.38 <br />Material weight description <br />Limestone -Broken Atljusled unit production : 123.65 LCV/hr <br /> <br /> Adjustetl lleet production: 247.30 LCV/hr <br /> <br />JOB TIME AND COST <br />Fleet sire . <br />2 <br />Dozers) <br />Total job lime : <br />30.21 <br />Hours <br />Untl cost : 51.119 /LCY Total job cost : $0,359 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.