My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC25030
DRMS
>
Back File Migration
>
Inspection
>
INSPEC25030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:24:38 PM
Creation date
11/18/2007 9:58:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Inspection
Doc Date
4/15/1994
Doc Name
BOND RECALCULATION-MAYDAY MINE PN M-81-185
From
DMG
To
SHALAKO INTERNATIONAL INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADABLE EAUIPMEIIT: sheet 2 of 2 <br />""""""""" Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr Ino. hauled) Cost/hr Cost/hr <br />Flatbed truck + S34.02 1 534.02 534.02 <br />x haul crew, reveg. oat. 6 equip., remove garbage Z debris <br />1908/DE110B SUPPORT EAUIPHEIJT: <br />"""""""""""""' IJeight Ownership <br />Non-Roadable Eqp. Description Itons) Cost/hr <br />-------------------------------------------------- <br />None <br />Roadable Eqp. Description <br />------------------------- <br />------------------------- <br />Ilone <br />-------------------------------------------- <br />-------------------------------------------- <br />Subtotals : 534.02 534.02 <br />Haul Rig Fleet Site Haul Trip Return Trip DOT Permit <br />Costlhr Ino. hauled) Cost/hr Cost/hr Cost/ea <br />--------------------------------------------------------------- <br />-------------------------------------------------------------------------------------- <br />Subtotals : 50.00 50.00 50.00 <br />Total Eqp. Fleet Sire Haul Trip Return Trip <br />Cost/hr Ina. hauled) Cost/hr Cost/hr <br />------------------------------------------------------------------------- <br />------------------------------ <br />------------------------------ --------------- <br />--------------- -------------- <br />-------------- ------------------ <br />------------------ <br />Subtotals : ---------- <br />---------- <br />50.00 ------ <br />------ ---------- <br />---------- <br />50.00 <br />EAUIPMENT HAUL DISTAIJCE G TIIJE <br />- - - - <br />Nearest major city or town <br />raithin project <br />area region: <br />Durango <br />Total one way travel distance = 20.0 miles . Average travel speed = 25.00 cph. <br />Job Tioe -Non Roadable Equip. = 0.50 hours load Roadable Equip.= q/A hours load <br /> 0.80 hours haul O.RO hours haul <br /> 0.50 hours unload 19/A hours unload <br /> 0.80 hours <br />------------ return <br />--------- 0.60 <br />-------- hours <br />------ return <br />-------- <br />JOB COST Total 9fob/Uemob Cost = 5561.02 <br />tJOTE: IJon-roadable equipment (haul rig required to transport) uob/demmb costs based on 2 round trips, each trip <br />consisting of a one-uav loaded haul and a one-way e¢Pty return. Roadable equipment Ino haul rig required) <br />casts based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segoents Within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars lane or two per rig depending on degree of oversizel are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially For equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br />support equipment needed For this work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.