Laserfiche WebLink
Colorado Division of Itinerals and Geology sheet 1 of 2 <br />ESTIHATI116 FORK - EAUIPHEI7T H08ILIlATIOPI / DEHOBILI2ATIOI! <br />--------------------------------------------------------- <br />--------------------------------------------------------- <br />Task 8... 5 Prep. by TD6 Filename..Ml65-5 <br />Date..... 14-Apr-94 Permit @ 11-81-185 Hine......tiayday Hine <br />Perait Action........ General 11012) bond recalculation <br />Task Description..... Haul reclamation equipment to d from jab site <br />HOUflLY EAU[PMEHT COST <br />--------------------- NOTE -This is a list to select from, not a list of mandatory hens to include. <br />--------------------- <br />liob/Demob Eqp. -Tractor : 6x4, 75,000 lb GYVI, 375 HP, diesel poixered <br /> -Lt. Trailer : 25 ton folding gooseneck, drop deck <br /> -Ifed. Trailer : 50 ton folding gooseneck, drop deck <br /> -Hvy. Trailer : 120 Ton folding gooseneck, drop deck <br /> -Pilot Car : On-highway light. duty truck, 4x2, 130 hp, IJ2 ton rating, gasoline powered <br /> -Hyd. Crane Grove RTSBD rourh terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boon <br /> -Fuel Truck : 6x4, 3,600 gallon capacity, 210 HP, diesel Dowered <br /> -Cube Truck 6z4, 2,500 gallcn capacity, 210 HP, diesel Do::ered <br /> -Flatbed Truck: 20,000 !b 6V0, 175 HP, diesel pouered <br />Last UPdate: ..................................................................................... <br />Ilay, 1991 <br />"""""" "" Lt. Rig Hed.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <br />--------------------- (=25 T. <br />---------- 26-50 T. > 50 T. Car <br />-------------------------------- Crane <br />---------- Truck <br />---------------- Truck <br />----------------- Truck <br />---------- <br />------------- <br />Ounership -------- <br />CostJhr ---------- <br />= 526.78 ---------------- --- <br />529.16 537.14 51.39 ---------- <br />519.89 ---------------- <br />56.02 ----------------- <br />510.66 ---------- <br />S6.10 <br />Operating CostJhr = 523.23 524.76 529.92 54.05 823.40 516.19 520.11 57.47 <br />Operator Cost/hr = 520.54 520.54 $2D.54 $19.61 520.86 519.91 519.91 519.97 <br />Helper Cost/hr = 519.81 <br />- <br />---- 519.81 519.61 50.00 <br />------- ------- ------- 50.00 <br />------- 50.00 <br />------- 50.00 <br />------- S0.00 <br />------- <br /> Total - <br />- <br />= 590.36 594.27 5108.01 525.25 564.15 542.18 551.34 534.14 <br />NON-flOADABLE EAUIPIIEIIT: <br />""""""" """" ' height Ownership Haul Rig Fleet Sire Haul Trip Return Trip DOT Perait <br />tlachine Description (tons) Cost/hr CostJhr (no. hauled) Cast/hr Cost/hr Cost/ea <br />-- <br />------------- <br />CAT 2D5 Hyd. ---- -------------- <br />Excavator -------------------------------- <br />14.48 S1D.20 590.36 ---------- <br />1 -- -------------- <br />5100.56 ----------------- <br />590.36 --- ----- <br />SD.00 <br />- - - <br />-------------------------------------------------------------------------------------------------------------------- <br />Subtotals 5100.56 890.36 50.00 <br />110 <br />