Laserfiche WebLink
r - <br />OF' CO <br />,~0 <br />lr% <br />.~a~. <br />'rns' <br />• <br />• <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />MINERALS PROGRAM INBPECTION REPORT <br />PHONE: (303) 866-3567 <br />The Division of Minerals and Geology has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance of the mining <br />operation with the permit and the regulations of the Mined Land Reclamation Board. The <br />report notes 1) Areas of successful compliance; 2) Problems and suggested corrective actions <br />and/or 3) Possible violations to be considered for possible enforcement action by the Mined <br />Land Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REQUIRE <br />MINE NAME: Williams Fork Pit OPERATOR: Williams Fork Comoanv <br />COUNTY: Moffat MINERAL: Sand nd Gr vel TYPE OF OPERATION: men Pit <br />INSPECTOR(S): -Tony Waldron and Carl Mount \~, <br />MINE ID / OR PROSPECTING ID iF: N-84-168 <br />INSPECTION DATE June 10, 1996_ DATE OF <br />COMPLAINT _NA <br />INSPECTOR'S INITIALS AJW/CBM TIME OF DAY (MILITARY) 17:00 <br />INSPECTION TYPE CODE(Fl MI POST INSP. CONTACTS(ZI NO <br />JOINT INSP. AGENCY CODE(zl NO REASON FOR INSP. CODE(3l IE <br />WEATHER CODE(4~ CL OP. REP. PRESENT Forrest Luke <br />1. INSPECTION TYPE CODB - [CAIN: IL=Illegal Opeation, M1=Monitoring, MP=Mineral Prospect, 51=Surety-related, PR=Prcoperation) <br />2. POST INSPECTION CONTACTS AND JOINT' INSPECTION AGENCY CODH - [CLAG: NO=None, BL=BLM, CH=Colo. Dept. Health; <br />CL=land Board, LT=Gtizen; CW=Wildlife, PS=Forest Service, HW=Hwy. Dcpt., LG=Local Government, SE=Start Engr.] <br />3. REASON FOR INSPECTION CODE- (CIrRS: AG=Other Agenry Requcst, CT=Citizcn Complaint, IE=Normal 1.4E Propam, FIP=High Priority, <br />PY=Priority] <br />4. WEATHER CODE - [CLWE: CL=Cloudy, CR=CIwr, iN=Inclement - prcventcd inspcction, RN=Raining, SN=Snowing, WD= Windy] <br />This list identifies the environmental and permit parameters inspected and gives a <br />catecorical evaluation of each. IF PB OR PV IS INDICATED. YOU SHOULD READ THE FOLLOWING <br />ATIONS. If PV ie indicated, you will be notified under separate cover when <br />reclamation Board will consider possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR)RECORDS . <br />(HB)HYDROLOGIC BALANCE <br />(PW)PROCESSING WASTE/TAILINGS <br />(MP)GENL MINE PLAN COMPLIANCE <br />(SM)SIGNS AND MARKERS . <br />(ES)OVERBURDEN/DEV. WASTE . <br />(AT)ACID OR TOXIC MATERIALS . <br />n (FN)FINANCIAL WARRANTY <br />y (BG)BACKFILL 6 GRADING <br />na (SF)PROCESSING FACILITIES <br />y (FW)FISH fi WILDLIFE <br />(SP)STORM WATER MGT PLAN <br />y (SC)EROSION/SEDIMENTATION <br />na (OD)OFF-SITE DAMAGE <br />n (RD)ROADS <br />y (EX)EXPLOSIVES <br />y (TS)TOPSOIL <br />y (RV)REVEGETAT ION <br />n (SH)COMPLETE INSP <br />y (RS)RECL PLAN/COMP <br />na (ST)STIPULATIONS <br />Y =Inspected and Found in Compliance PV =Inspected and Passible Violations Noted PB =Inspected and Problcros Noted <br />N = Not Inspected NA = Not Applicable <br />WHITE - PUBLIC FILE YELLOW - OPERATOR PINK - CORRESPONDENCE FILE <br />Y <br />na <br />Y <br />Y <br />n <br />Y <br />n <br />