Laserfiche WebLink
<br />MINE ID # OR PROSP CTING ID # H-[ ~'~"~~° <br />INSPECTION DATE~~~Iq <br />4. The volume of topsoil stockpiled is estimated to be <br />less significantly less than that require to complete <br />the reclamation plan. <br />CORRECTIVE ACTION: Measurements, data, etc. must be provided <br />that demonstrate that the volume of topsoil stockpiled <br />is adequate to meet the requirements of the reclamation <br />plan or a commitment made .to import the necessary volume <br />of topsoil or~the reclamation plan must be modified by <br />submittal of an appropriate permit modification or conversion <br />INSPECTOR'S INITIALS <br />CORRECTION <br />DATE <br />June 1, 1999 <br />PB or PV: PB <br />TOPIC: TS <br />1 <br />a~ <br />~p ~~,,np~~nY" (1,~~V' ~1 <br />Q ~ C~~\~\ YY~~.~,,~,~eP~,,+~ <br />April 1~I99 B9'"'t'`+' <br />PB or PV: PB <br />TOPIC: AR,OD <br />5. There is mining disturbance attributed to the previous permittee <br />beyond the permit boundaries to the north. This area lies between <br />and is linked with areas of excavation by the current permittee. <br />Although the current permittee is not considered to be in violation <br />for the disturbance outside the permit boundary, he is, with the <br />transfer of the permit, considered to have assumed the obligation <br />to reclaim this disturbance. <br />CORRECTIVE ACTION: The permittee should commit, in writing, to <br />reclaim the disturbance attributed to the previous permittee <br />according to the requirements of the approved reclamation plan. <br />~ 6. There is an overhead utility line crossing the permit area <br />with supports located within the permit area boundaries in <br />locations that may be directly and adversely impacted by the <br />mining operation. There is no agreement in the permit package <br />to compensate the owner of this line for any damage brought about <br />by the mining operation and the mining plan does not make any <br />provision to prevent impacts to the line. <br />CORRECTIVE ACTION: The permittee should either secure a compensation <br />agreement with the owner of the utility line or modify the mining plan <br />to demonstrate that the line and its supports will not be damaged by <br />the mining operation. <br />7. The extent and nature of the minimg related disturbance at this <br />site is such that the currently posted Financial warranty of <br />$5,000.00 appears to be inadequate to complete the approved <br />reclamation plan. <br />CORRECTIVE ACTION: If the Division's re-evaluation of the <br />reclamation cost for the site indicates the current Financial <br />warranty is insufficent to complete the reclamation plan, <br />the operator must supply additional Financial Warranty. <br />(Page 5) <br />~~ I <br />h ~~~ <br />~~~~°Q <br />June 1, 1999 ~ <br />PB or PV: PB~ ~ <br />TOPIC: AR <br />` ~V <br />~ ~,~ <br />Within 60 days <br />of notice of an <br />insufficency <br />PB or PV :PH <br />TOP C FN 1~,A <br />FU"'A <br />l~Uy~Q~ ~ U"' .D <br />V~ ~I,V` <br />~~a <br />