Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-1981-207 <br />INSPECTION DATE 4-30-2003 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 Material has been import d to th cit -for is ac permanent structural fill without required notice <br />being submitted to DMG. O6 / 18 / 2003 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): AR <br />Submit adequate notice of importation of material as required by Rule 3.1.5 (91. <br />2 <br />containment structure has been installed. O6 / 18 / 2003 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPIC(S): AT <br />Either remove all hazardous materials and unpermitted spill containment structures from the site. or <br />submit a technical revision application addressing incorporation of adequate spill containment for all <br />hazardous materials stored on site. Include size and construction specifications and <br />demolition/disposal details with reclamation cost calculations. <br />3. <br />/ / <br />PB or PV: <br />CORRECTIVE ACTION: TOPIC(S): <br />I, Steve Shuey, hereby certify that on May 21, 2003, I deposited a true and complete copy of this foregoing inspection <br />report in the United States Mail, first class postage paid, to the operator of record for this site at the address indicated, <br />and to those others within the body of this report who have been designated to receive copies (DMG personnel <br />excepted). <br />~d-~~t~~) C~ <br />Signature <br />