My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC23055
DRMS
>
Back File Migration
>
Inspection
>
INSPEC23055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:23:03 PM
Creation date
11/18/2007 9:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990059
IBM Index Class Name
Inspection
Doc Date
7/30/1999
Doc Name
GENERAL 110 1 BIND REVIEW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd <br />Subtotal (K): E324 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description I Cost (E) <br />________ I __________________________________________________ I ____________ <br />1 I BackfiLl portal 25' deep with waste rock materiaLl E324 <br />I I <br />I I <br />I I <br />L. GRILL HOLE/MONITORING NELL SEALING <br />Task No.l Task Description <br />NA ~ Not indicated <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description <br />sheet 4 of 4 <br />Cost (E) <br />Subtotal (L ): <br />I cost <E) <br />I I <br />6 I Demolition assume mass 10'L • 5'W " 5'H a E.22/cfl <br />4 I Seeding per attached task 4 worksheet I <br />NA I Fencing not required at [his time I <br />5 I Mob/Demob per attached task 5 worksheet I <br />555 <br />5498 <br />E148 <br />Subtotal (M ): 5701 <br />____________ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E1,974 <br />I[. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l Item Description I Cost ($) <br />________ I <br />1. I __________________________________ <br />Public Liability Insurance.... ________________ I <br />1.SSOX of dir. ~ __________. <br />E31 <br />2. I Contractor's Performance Bond 1.SSOX of dir. I E31 <br />3. I Contractor's Profit........... 10.OOX of dir. I E197 <br />4. I Job Superi ntendent.. equip op serves as super I <br />Subtotal (A): 5259 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 & P): E2,232 <br />____________ <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.l item Description ~ Cost (E) <br />________ I __________________________________________________ I____________ <br />I I <br />1. I Minerals Program Admin: Fee at S.OOX of cntr.l E712 <br />NET INDIRECT COST PERCENTAGE: 18.76X <br />_____ Subtotal (B): <br />_ <br />_ <br />_ 5112 <br />_ <br />_ <br />_ <br />_ <br />_____ <br />TOTAL INDIRECT RECLAMATION _ <br />_ <br />_ <br />_____ <br />COSTS (subtotals A through 8): _ <br />_ <br />_ <br />_ <br />E370 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E2,344 <br />
The URL can be used to link to this page
Your browser does not support the video tag.