Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No. Task Description ~ Cost (S) <br />__________________________________________________________I____________ <br />NA Not indicated <br />________________________________________________________________________ <br />Subtotal (H): <br />____________ <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />NA ~ Accomplished under task 2, 3 8 4 <br />____________________________________________________ <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (S) <br />________I____________________________________________~____I___________. <br />3 ~ Approx. 4 hours required to distribute 22 cy ~ 8790 <br />topsoil over affected areas. <br />14 hrs • 847.44/hr = 5189.76 I <br />Subtotal (J ): 5190 <br />