Laserfiche WebLink
1 • • 4 <br />changes it, and failure to repair rips and holes in the tailings impoundment liner). <br />C&DO'S were issued on fire tailings containment and water management issues; <br />civil penalties is the amount of StL~ssessed. <br />15 June '92 COM, lnc. petition for reconsideration of MLRB action of 28 May '92 (see above). <br />23 June '92 MLRD staff inspection of millsite; issues identified in 22 May '92 repoR Gave been <br />addressed, responses to NOV A"s M-92-029 & M-92-030 received. All aa-ground <br />problems resolved. <br />25~ June '92 MLRB hearing to review submitted COM, lnc. plan for water management plan still <br />needs specifications on orator well, pumping station (at Left Hand Creek}, and <br />interrnnnections. Deposit of tme moneys mandatory prior to any reconsideration by <br />Board. ` <br />17 Aug. '92 COM, lnc. (C. A. Steen) ltr to MLRD (W. York-Feirn) identifying completion of well <br />into Timcs Mine, and pipeline from wellhead to mill, sad tnarkout of pumping station <br />site on L.etthand Creek. Requests permit modiFication to allow use of offsite ore meeting <br />permit guidelines and owned by COM, lac., and to use dolomite and/or monzoaitz for <br />pH control. <br />1$ Sept. '92 BCLUD {R. Helmick) ltr to MLRD (W. York-Feirn) re: COM, lnc. request for TR, <br />stating that processing of imported ores would be in direct violation of coanty <br />zoning, and that approval of the TR would not be in the public interest. <br />21 Sept. '92 E. Freirich ltr to BCLUD (R. Helmick) transmitting citizen petition to MLRB requesting <br />denial of permission to acpand use of the mill to include milling of otfsite or currently <br />unpermitted sources. <br />7 Oct. '92 DMG (W. York-Feirn) ltr to COM, lnc. (W. Tatman) transmitting partial approval of <br />TR-03, subject to stipulations, including requirements for characterisation of all otfsite <br />ore.¢ and pn"or sntiroval of ore nroc~~ss'ne_ before ore is placed oasite. litter of even date <br />and same coatem seat also to M. Stem. <br />].9 Dec. '92 First.of a series of meetings betwaa COME (R. Mason) end COM, lnc. {W. 'fatman) <br />to discuss mutual goals and technical issues. Four meetings occurred, with last on 13 <br />Feb. '93. <br />l0 Apr. '93 COME (R. Mason) telecon with Rottman Laboramries confirms ao monitor well water <br />analysis reports have bees nm by them since 27 April '92. <br />24 June '93 DMG (w. York-Feira) handwritten to-0o list provided to COM, lnc. (W. Tatman) <br />covering actions required before start-up of mill; inelades requirement to sample both <br />top and bottom of water column in momtot wells snd divide each sample, half for <br />pH, the other (HCl acidified) for metals analysis. <br /> <br />