Laserfiche WebLink
'. . • 3 <br />overflows and other spills. (This was never accomplished.) Upland diversion ditch <br />around tailings impoundment plugged (PB, correction deadline 3/24!92). <br />3 lvlar. '92 MLRD (M. Long) ltr to GHVLP & COM, lnc. subj.: Reason to Believe to the Co- <br />opcators for failure to repair liner. <br />4 Mar. '92 MLRD (M. Long) Itr to GHVLP & COM, Inc. subj.: Reason to Believe to the Co- <br />operators for failure to provide a technical revision for water management. <br />4 Mar. '92 MLRD (M. Long) hr to GHVLP 8c COM, Inc. subj.: Reason to Believe to the Co- <br />operators for uncontained tailings material around mill building. <br />2"; Mar. '92 MLRB issues C&DO and assesses civil fine of 523,370 for processing ore from the ~ <br />Buono and Cmss mines, not owned by GHVLP. <br />3 Apr. '92 DMG sends Notice of Possible Violation (NOPV} letters to Co-Operators for <br />uncoatained tailings spills, failure to provide a TR with detailed watt pumping <br />plan, and rips in impoundment liner. <br />16 Apr. '92 DMG inspection report notes (under "Problems/Possible Violations and Corrective <br />Actions') failure to repair rips and holes in tailings pond liner (PV, correction <br />deadline 5/22/92), ancoatained tailings material and erosion channels ootside mill <br />building and tailings impoundment u well as off site between the tailings <br />impoundment and the Hsul A edit (PV, carnction deadline 5/22/92), only one of <br />three standpipes are erected in the tailings pond (PB, correction deadline 5/22192), <br />upland diversion ditches nut properly maintained and functional (PB, correction <br />deadline 5/22!92, hazardous location of tailings discharge line (PB, correction <br />deadline 5/22192), failure to minimize possible offsite damage from fuel teaks (PB, <br />correction deadline 5/22/92), failure to fence the tailings impoundment (PB, <br />correction deadline 5/22!92), failure to remove /age debris pile from permit area <br />(PB, correction deadline 5/22/92), failure to display proper signs and markers (PB, <br />correction deadline 5/22/92, correction to include boundary markers, a sign at the site .~ <br />entrance which includes site name, operator Dame, and a statement that an MLRD permit ` <br />has peen obtained, permit number). <br />:t7 Apr. '92 Date of last known well samples analyzed by Huffman laboratories. All samples showed <br />precipitates on bottom, so analyses of Liquid portions only is of dubious value. (see note <br />for 3U April 1993) <br />:Z8 Apr. '92 BCLUD ltr to CUM, Inc, stating that the milling of imported ore is an industrial use not <br />allowed in a Forestry Zone (i.e. at the Gdd Hill Milt). Note: this letter not in COME <br />files, see rtifererue in BCLUD (M. Sprague) Itr to COM, Inc. (G. Fraser) dated 22 Aug. <br />'94. <br />28 May '92 Board issues NOV's on 3 April issues (failure to contain tailings, failure to conform to <br />the use of the permitted water managemmt rystem or submit a technical revision that <br />~~. -- - <br />rid <br />rid <br />is <br />