Laserfiche WebLink
<br /> <br />24 <br />imperative that all water be purged from the Hazel-A, through evaporation in tl~e <br />~ lofting pond, as soon as possible.' This was restated in a letter to rile from A. <br />Sorenson dated 9114/95. Pond freeboard (type not specified) was measured at 15 inches. <br />Note: Pond trceboard observed was is clear violation of requirements (ref. A. <br />Sorenson dt B. York-Feirn Inspection Report of 28 Feb. '95) <br />17 June '97 DMG (M. Long) ltr to COM, Inc. (C. gesnhardt} restates reason-to-believe for PV's of <br />April 9 and May 6 '97 and re-sets hearing far July. <br />22 July '97 DMG (G. Curtis, C. Mount) inspection report identifies 1 PV due to non-operation of <br />the tailings pond spray evaporation rystem as required (see 26 April '97 entry above). <br />Report estimates 17 inches of 5'eeboard in pond. <br />Note: Ditto flu: above note. This condition also is a clear violation of CUM, !ac's <br />conunitment W estabtisha~eat and maiateaance of 6 feet of normal freeboard (ref. <br />COM, lac. ltr of 18 July '95). <br />2?~('I)July '97 DMG (G. Curtis) letter to C. Bernhardt; notification of hearing oa possible violation (ref. <br />April 9 and May fi, 19517 entries). <br />.. <br />Uocumeats not in CUMfi files. <br /> <br />