<br /> <br />la <br />16 Aug. '95 COM, lnc. ((~. Fraser) Itr to R. Mason mentioning Mill Storm Water Permit. <br />18 Aug. '95 Logged EPA report for trace metals analysis of Hazel A water, dated 7130/95; showed <br />very high levels of body Lead (41 ug/L) sad Molybdenum (38 ug/L). Not tested <br />far Arsenic, Selenium, some outer baddies. <br />22 Aug. '95 COM, lnc. (G. Fraser) Itr to MLRB (presented at the Aug. 24 MLRB meeting), stating <br />in part, "1 toot seriously the implication of one of your Board members that COM, <br />lnc. appeared to be a sutall time operator acting negligently anal causing <br />difficnriies for the legitimate operators with regulators. 1 want to make every effort <br />to correct that impression. That is not consistent with my style or my reputation is my <br />industry.' <br />24• Aug. '95 M. Steen memo to DMG (A. Sorenson) listing seven items needing correction at millsite. <br />As of this date (October 9, 1995), one of these (diversion ditches) has been completed, <br />three others (decant lines, Hazel A cleanup and pumpout, and stash and contaminated soil <br />cleanup) have been partially completed, and three (pond liner damage, anchoring. and <br />game fencing) have not been addressed. <br />21i Aug. '95 DMG (A. Sorenson) site inspection at mill. 5u (6) PB, including Hazel A water <br />discharge and insufficient freeboard behind Hazel A bulkhead. Corrective action included <br />r~equiremeat that Hazel A alit shouts be maintained essentially dry eacept after <br />significant rain events. Need follow-up verification that CDH requirements (see below) <br />were met for trash cleanup and oiUsoil removal; Haze! A 'Lined coffer dam_and sumo- <br />back y~~stem not in place ac of tti:s date (required to be complete NLT 1 Oct. '95); obtain <br />results of Hazel A slimes ("fault-gouge") analysis, due back by mid-Sept. <br />1 Sep. '95 Hoard order to commence site reclamation by 28 July 1995 vacated. Monthly <br />activities and issues updates imposed for six (6) months. <br />1 Sep. '95 DMG (M. Long) ltr to COM, lnc. (G. Fraser), subj.: NOV tot failure to obtain <br />separate permit by required date. <br />14 Sep. '95 DMG (A. Sorenson) ltr to File !f M-94-117 (Gold Hill Mill tile) recording COME (R. <br />Mason) report on Hazel A water level. L.tr r+eittrates a near-zero water level <br />requirement in Hazel A and warns of an itttpeadiag insp~~tion on 25 Sept. 1995, with <br />possible NOPV resulting if due diligence on pumping is not demonstrated. <br />14 Sep. '95 CDPHE, Stnrmwater Management Division (D. M. Belay) ltr to COM, Lnc. (G. Fraser); <br />third request for SWMP, noting Fines up to S101Uday for violations of State req'ts. <br />l.5 Sep. '95 COME (R. Mason) ltr to DMG (A. Sorenson) documenting 14 Sept. telecon (see <br />Sorenson Itr to File above). <br /> <br /> <br /> <br />----- ,i. .. _. <br />