My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC22470
DRMS
>
Back File Migration
>
Inspection
>
INSPEC22470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:22:37 PM
Creation date
11/18/2007 9:44:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
Inspection
Doc Date
3/29/2000
Doc Name
OSM INSPECTION REPORT
Inspection Date
2/7/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permit[ce/ Permit Field Visit <br />Person GEC STR[P,C/O THE Number C-81-037 Date 02/07/2000 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Identified E ewhere, 6=Previously Cited <br />L _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Conuol <br />6. - Temporary Cessation <br />7. - AML Rec. Fees --Non-Respondent <br />8. _ AML Rec. Fees -- Failure [o Pay <br />B. Hyd rologic Balance <br />1._ Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Structures <br />4.- Discharge Structures <br />5. Diversions <br />6. Effluent Limits <br />7.- Ground Water Monitoring <br />8. _ Surface Water Monitoring <br />9. -Drainage -- Acid-Toxic Materials <br />10. - Impoundments <br />11. _ Stream Buffer Zones <br />C. TopsoB & Subsoil <br />l._ Removal <br />2.- Substitute Materials <br />3._ Storage and Protection <br />D. Backfilling & Grading <br />l._ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5._ Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Material: <br />7._ Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />I._ Placement <br />2._ Drainage Control <br />3. Surface Stabilization <br />4._ Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />l.-Drainage Control <br />2._ Surface Stabilization <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. Administrative ......................................................................... <br />1. Valid Pemut .......................................................................... ...........773.11 <br />2. Muting within Bonded Area ...................................... ..........773.11 <br />3. Terms & Conditions of Permit ................................... ..........773.17 <br />4. Liability Insurance ...................................................... ..........800.60 <br />S. Ownership and Conuol .............................................. ..........778.13 <br />6. Temporary Cessation ..............................842.1 I(e) & 816/817.131 <br />7. AML Rec. Fees --Non-Respondent ........................... .....870.15(b) <br />8. AML Rec. Fees -- Failure ro Pay ................................ .....870.15(x) <br />Excess Spoil Disposal ...........................................(816/817. <br />Drainage Control <br />Surface Stabiliza~ <br />Inspections & Ce <br />H. _Subsidence Control Plan <br />I. Roads <br />I._ Road Conswction <br />2. Certification <br />3.-Drainage <br />4._ Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1._ Signs <br />2._ Markers <br />K. _Distance Prohibitions <br />L. Revegetation <br />I._ Vegetative Cover <br />2._ Timing <br />M. _Postmining Land Use <br />N. Other <br />.......7 <br />F. Coal Mine Waste (Refuse Piles/lmpouadmeors) ,,,,,(g16/817.81-84) <br />1. Drainage Conuol ................................................ ...............................83(x) <br />2. Surface Stabili7ation ........................................... ...............................83(b) <br />3. Placement ............................................................ ...............................83(c) <br />4. Inspections and Certifications ............................. ..............................83(d) <br />5 Impounding Swctures 84 <br />B. Hydrologic Balance ......................................(8161817.41-57) ........................................................................... <br />G. Use of Explosives ..................................................(816817.61-68) <br />1. DrainageConvol ............................................. ............................45 <br />2. Inspections & Certifica[ions ........................... ..................49(x)(10) <br />3. Siltation Swcmres ......................................... .............................46 <br />~4. Discharge Swetures ...................................... .............................47 <br />5. Diversions ....................................................... ............................43 <br />6. Effluent Limits ................................................ ............................42 <br />7. Ground Water Moni[oring .............................. ........................41(c) <br />8. Stuface Water Monitoring .............................. ........................41(e) <br />9. Drainage--Acid-Toxic Materials ................... ........................41 (f) <br />10. Impoundments ................................................ ............................49 <br />11. Sueam Buffer Zones ...................................... .............................57 <br />C. Topsoil &Subsoil ...............................................(S1N817.22) <br />1. Removal .................................................... ..............................22(x) <br />2. Subsutute Matetials .................................. ...............................22(c) <br />3. Storage and Protection .............................. ...............................22(c) <br />4. Redistribution ........................................... ...............................22(d) <br />D. BackfilJGng & Grading .............................. (816/817.95-107) <br />1. Exposed Openings .....................816/817.13, 14, I5, & 823.11 & 21 <br />2. Contemporaneous Reclamation .......................... ........................100 <br />3. ApproximateOriginalContour ........................_. .._...........102(x)(1) <br />4. Highwall Elimination .......................................... ...............102(x)(2) <br />5. Stcep Slopes (includes downslope) .................... .............:..........107 <br />6. Handling of Acid & Toxic Materials .................. ....................102(c) <br />7. Stabilization (rills and gullies) ............................ ......................95(b) <br />a~.:md o,aesa ~. i9sa Page 2 of <br />E. <br />1. <br />z. <br />3 <br />4. <br />3. Placement General <br />4. _ Inspections and Certifications Performance <br />5. -Impounding Structures Category <br />G. Use OC Explosives ~ <br />I) forfeiture evaluntioa - <br />l. Blaster Certification _ <br />2. _ Distance Prohibitions 2) <br />3. _ Blast Survey/Schedule _ <br />- <br />4. _ Warnings & Records 3) <br />5. -Control of Adverse Effects _ <br />- <br />1. BlasterC-ertification ............... ............................................................61(c) <br />2. Distance Prohibitions ............. ............................................................61(d) <br />3. Blast Survey/Schedule ........... ............................................................62-64 <br />4. Warnings & Records ............. .........................................................66 & 68 <br />5. Conuol of Adverse Effects .... .................................................................67 <br />H. Subsidence Control Plan .........................................(817.121-122) <br />I. Roads .................................................................(816/817.150-151) <br />I. Road Consttuction ................. ..........................................................150(c) <br />2. Cenifica0on ........................... ...........................................................151(x) <br />3. Draina&e ................................ ...............................................I50(b)-ISI(d) <br />4. Surfacing and Maintenance ... ...............................................I50(e)-I51(d) <br />5. Reclamation ........................... ...........................................................150(0 <br />J. Signs & Markers .......................................................(816/817.11) <br />L Signs .....................................................................................11(a).(b).&(c) <br />2. Markers ......................................................................Il(a).(b),(d),(e),&(t) <br />R Distaace Prohibitions .......................................................(761.11) <br />L. Revegetatioo .................................. ...................(816/817.111-116) <br />1. Vegetative Cover ................................... ....................................1 Il & 116 <br />2. Timing ................................................... ...............................................113 <br />M. Postmining Land Use .................... ..........................(816/817.133) <br />
The URL can be used to link to this page
Your browser does not support the video tag.