Laserfiche WebLink
<br />~c" ~~~ ~~~~~~~~~~~~~ ~~~ U. S. DEPT. OF THE INTO <br />``.~ _..._ 999 <br />OFFICE OF SURFACE <br />Mine Site Evaluation 2 9 2000 <br />State <br />Division of Minerals & Geology <br />L Pernuttee/Person 9. Permit Number 10. Permit Type <br /> GEC STRII',C/O THE CORLEY CO. (LANDOWNER) C-81-037 PP <br />2. Address 11. Field Visit Date 12. ose 13. SRA Present <br /> P.O. BOX 1821 02/07/2000 ~ ~Y <br />3. Ci 4. State mm-ad -yyyy <br /> <br />Colorado S r. <br />CO 14. Permit Status <br />~ 15. Site Status <br />~ 16. ~Facili e <br />I I <br />5. Zi Code 6. Plrone Number II ~A II <br /> <br />80901 <br />( ) - 17. OSM Office # 18. CCID # l9. Land Code <br /> <br /> 140 <br />7. erator Nanre, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> REVOKED - DMG ADMINISTERED ~ FREMONT <br /> Cp <br />8. Mine Name <br /> <br />GEC STRH' 23. AVS Permittee Entity ID Number 24. State Office <br /> <br />r n D D <br />25. Hours <br />0.5 a_ Permit Review 2t ~ ~'n a ock <br />~/ 27. Reviewing Official: <br />I <br />~: <br /> <br /> 3.0 b. Site Visit Time ' t tore' <br />MITCH O LINGS ID # 370 Signature: <br /> ' <br /> 4.0 c. Travel Time Printed Name: !JD <br />Review Date: 3 / / 2o <br />dd <br /> mm - <br />- yyyy <br /> 1.5 d. Report Writing Date: 03/08/2000 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No PermB <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Refenal (non site visit) <br />O>«,,,.OVersight RFx.... Reclamation Fees CC...... Citizen Complaint (initial s8e visit) <br />Axx.... Assistance Fxx..... Federal Actlons CCF.... CBizen Complaint Follow-up <br />Joint Inspection -Item 13 A Joint inspection is when a state inspector accompanies an OSM Inspector any Ome durtng the review of the mine s8e. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal miningg activities have ceased and <br /> <br />A.... Active: Coal mining and reclamation acOvilies occurting or operator has left the site without cemplebng reclamafion as defined In <br />30 CFR 840.17 )) <br />g <br />ppertni0ed but not yet disturbed. <br />IN <br />I <br />di <br />P AB1.. Bond ForteBure~ <br />Bond forfeiture officlalty In process or completed, end. <br />.... <br />na <br />ve ( <br />ermanent Program Permit): Phase II completed or <br />Temporary Cessation of Operations. (Interim Program Permit) recamation In pr ress or not yet commenced. <br />AB2..Partialy Reclaimed Forfeiture: Forfeited site where ell bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim s8e, but site nct reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory <br />Authority (RA) has released all of the bond (Phase III Release.) A83.. Reclaimed FoReBure: Forfeited site that has been reclaimed to Program standards. <br />NA...Not Appticeble: When site is unpermitted. <br />Site Status Codes - ttem 15 NS.. Non-Site YsB: Status of s8e not determined. <br />ND._No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on s8e, FP.. ForfeBurs Pending: The RA Is pursuing <br />operations have been started. site regraded and avra8ing pphase bond release. actions to revoke the pern8, tolled the <br />FX_Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted peAortnance bond(s), and/ar reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 8161 lion of foAeBed s8e rs in progress. <br />have nct begun. 817.131(b). FR.. ForfeBed and Reclaimed: ForteBure <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I RRelease: At least Phase I bond release reclamation completed. <br />adiv8ies are occurring. granted far engre permitted area. For Interim FO.. Abandoned SBe: Abandoned s8e that <br />AN.. Alive Non-Producing: Alive non-producing permits, partial bond release. Is permitted but there is no bond. <br />fall'rry such as tipple or preporation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcet: Coal mining and reclamation <br />NM..No Mining: The PermB Status is acuve, site is for the entire permitted area. operations have or are talang place and <br />nct in Temporary Cessation, no surtace coal P3.. Phase III Release: Reclamagon completed and the activity Is not covered by the <br />racmry r ype ~.oaes - rrem io D...Ancillary (Haulroad, Conveyor, and/or Rails) H... Exploration Permits L... Remining s8e pertni8ed <br />A... Surface E... Refuse and/or Impoundment I... Nctice of Intent to F~lore under 30 CFR7&5.25 <br />8... Underground F... Loadingg Facility and/or Tipple J... Exempt 16 and 213 <br />C... Preparation Plant G... Stockples K.. GovemmeM Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Ira~portant <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 lfe®onal Fairness Hoards were established to receive comments fmm <br />mtall businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each enc s <br />responsiveness to small business. )f you are a small business (a business vvi0t 500 or fewer employees including those of afLliales) page 1 of <br />and wish [o comment on the enforcement or compliance activities of OStvt, call 1-888-REG-FAIR (1-888-734-3247). ~,~~yQ ~, ryye <br />