Laserfiche WebLink
III. COMMENTS -COMPLIANCE - - ' <br />Below are comments on the inspection. -The comments include discussion of observations made .. - <br />during the inspection. Comments also describe any enforcement actions taken during-the inspection <br />and the facts or evidence supporting the enforcement action. <br />of these post mine channels. As TR-34 is pending approval, SCC may consider revising Exhibit <br />13-2, Backfill and Grading Schedule to reflect more accurate completion dates for these drainage <br />channels. <br />Backfill & Gradine <br />A small portion of the Wadge East Pit area remains to be final graded. Topsoil replacement and <br />seeding should be completed in the entire Wadge East Pit area this Fall in accordance with the <br />revised Backfill and Grading Schedule (Exhibit 13-2). <br />Rills and gullies have formed in the lower portion of the Wadge East Pit area below the location <br />of the shrub establishment/elk fence azea. Please dress the slope in this azea and repair the rills <br />and gullies that have formed at this location. This area should be reseeded in the fall along with <br />the remaining portion of the Wadge East Pit mentioned above. <br />