Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />Overall, all of the SAE's inspected (all of the permitted SAE's on the site) are functioning <br />properly and are installed properly. There does not appear to be any sediment getting <br />off-site from any of these SAE's. <br />PROCESSING WASTE: The covering and topsoiling of the refuse pile has been completed. The <br />Operator has also completed the grading and topsoiling of the topsoil stockpile, cover soil <br />stockpile and borrow areas. <br />To soil: The entire mine site has been topsoiled. <br />REVEGETATION/RECLAMATION SUCCESS: The vegetation on the (previously reclaimed portion <br />of the) refuse pile was in good condition. There was an indication of some new growth, <br />however there is not much because of a dry winter and spring. The vegetation at the loadout <br />was similar to that of the surrounding areas but has not yet started to turn green. The <br />Operator has planted a cover crop on the area to help control erosion until final seeding this <br />fall. <br />