Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-tact-nos <br />INSPECTION DATE: tuna 2$ 7nm <br />INSPECT-OR'S INITIALS: ~]1dL <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The actual post mining topography does not match the post-mining topography that was approved 10 / 15 /02 <br />in a origins an amen a app icy ions. <br />PB or PV: ~B_ <br />TOPIC(S): Rc. <br />Corrective Actions are to: BG MP <br />Suhmit a tarhniral revicinn to tha annliratinn that revicac tha matarial halanra of mina prndnrt to <br />mine waste and then utilizes this information to revise the post-mining~oRggraphv. Once this revision <br />is suhmittPd and apprnva it will hammy tha hacic fnr ra-ralrnlating tha financial warranty <br />2. <br />Cor rective Actions are to: <br />Prnvida dnnimantatinn that rlaarly chn wc tha nnerator'c right to enter and mina tha huffar hahveen <br />sections 4 & 9 and provide a ma oar ma p wi h s iRpQrting documentation { jQ: TR. Amendmentg~cl <br />illnctrating_tha mnct rarantly annrnvad m ina Ips <br />affartad land nr rerlamatinn plan m~tp that aippnrtc <br />tha right to antar and mina that area , <br />10 / 15 /02 <br />PB or PV: _P_B_ <br />TOPIC(S): _~ <br />3. / / <br />PB or PV: <br />TOPIC(S): <br />