Laserfiche WebLink
III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules and <br />Regulations, and the permit a]so are identified below. <br />Hydrologic Balance (4.05) <br />1. The gravel surfacing and installation of rock check dams on silt fences <br />at the rail load-out was not completed. Part of the system was constructed. <br />Construction was halted due to emergency flood conditions along the North Fork <br />of the Gunnison. The contractor work at the Terror Creel Loadout left the <br />sight to aid in flood containment work along the river. (See section IV <br />Problems Recommendations and Compliance Dates). <br />Drainage ditches, culverts and sediment ponds were all in good condition. <br />