My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC21175
DRMS
>
Back File Migration
>
Inspection
>
INSPEC21175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:43 PM
Creation date
11/18/2007 9:38:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977392
IBM Index Class Name
Inspection
Doc Date
10/16/1996
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Tesk No.~ Task Description ~ Cost (f) <br />.____~I_________~~__________________~_____.__.___~..I ___...______ <br />L. DRILL ROLE/MONITORING HELL SEALING <br />Task No.~ Task Description <br />Subtotal (K I: <br />Cost (S) <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Tesk No.~ Task Description <br />Demolition <br />5 ~ Seeding <br />Fencing <br />6 ~ Nob/Demob <br />Subtotal (L): <br />Cost (f) <br />f14,035 <br />53,159 <br />Subtotal (M): f17, 194 <br />------------ <br />TOTAL DIRECT RECLAMAT(ON COSTS (subtotals A through X): 571,984 <br />I1. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (S) <br />_.._.___I_________________________________________________.,I.___________ <br />1. ~ Publ it Liabi Lity Insurance.... 1.550% of dir. ~ 51,116 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ !702 <br />3. ~ Contractor's Profit........... 70.00% of dir. ~ f7, 198 <br />4. ~ Job Superintendent.. <br />Subtotal (A): !9,016 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f81, 000 <br />B. DNG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description <br />Cost (S) <br />1. ~ Minerals Program pdm 5.00% of cntr,~ f4,050 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B ): !4,050 <br />____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f13, 066 <br />TOTAL PERFORMANCE BOND AMg1NT (direct plus indirect costs): !85,050 <br />
The URL can be used to link to this page
Your browser does not support the video tag.