Laserfiche WebLink
RECLAMATION COST SUMMARY cant'd sheet 3 of 4 <br />H. EARTHWORK STREAM CHANNEL RECONSTRUCTION <br />Task No.~ ~ Tesk Description ~ Cost (f) <br />_____.~ I ._________~.~._________..~~________~.w___ I ___~_______ <br />Subtotal (H ): <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description ~ Lost (S) <br />________I________________________________________________~I_____.._____ <br />_________________________________~. ~____~_..r___________..______ <br />Subtotal (I): <br />J. EARTHWORK TOPSOIL/SUBSOIL REPLACEMENT <br />Tesk No.~ Task Description ~ Cost (S) <br />3 ~ Spread topsoil over 78 acres ~ f4,440 <br />Topsoil cost CS6.50/CY) ~ f34,015 <br />4 ~ Spread overburden excess over 18 acres ~ (14,810 <br />Subtotal (J): 553,265 <br />