Laserfiche WebLink
C ~ (Page 3) <br />MINE ]D # OR PROSPECTING ID # M-94-117 <br />INSPECT ION DATE 09/14/99 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />There is currently no way to measure the pond depth at the site. This is Oct. 9, 1999 <br />contradiction to Rule 3.1.6(1) of the Hard Rock Materials Rules and Regulations. PB or PV PB <br />CORRECTIVE ACTION: A yardstick or tape measure needs to be installed in TOPIC(S) HB <br />the pond. in order for accurate measurements of the pond depth to he taken, prior <br />to the approval of the Temporary Cessation request. <br />2 <br />3 <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />