My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC21099
DRMS
>
Back File Migration
>
Inspection
>
INSPEC21099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:40 PM
Creation date
11/18/2007 9:38:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Date
9/23/1997
Doc Name
MINE SITE EVALUATION INSPECTION REPORT
Inspection Date
8/19/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'top width = 3'; depth = 6"; bottom width = 1' <br />NOTE: the ditch at this location was trapezoidal instead of V-shaped as <br />required; DMG directed the permittee to perform maintenance on it by the <br />end of the day. <br />B. Half-Culvert O: <br />"30" diameter half CMP as required; inlet and outlet clear <br />C. Culvert N: <br />'30" diameter CMP as required; inlet trash rack clogged and displaced. <br />Energy dissipating riprap at outlet displaced. \ <br />NOTE: DMG directed the permittee to perform maintenance on the inlet 1 <br />by the end of the day. DMG also directed the permittee to replace riprap <br />at the culvert outlet, which required the use of heavy equipment and <br />couldn't be finished by the end of the day. Also, drainage in the channel <br />just uptdradient of the confluence with the west collection ditch flowed <br />outside the channel but re-entered it just downstream. DMG directed the I <br />permittee to perform maintenance to correct this problem, which also <br />required heavy equipment and more time. ' <br />D. West Collection Ditch: <br />1. @ pt. near cross section AA-AA <br />`top width = 15'6"; bottom width = 5' ;depth = 29"; riprap concreted <br />2. culvert N1: <br />'two, 36" diameter CMP culverts (24" required); inlet trash racks clear; <br />outlet recently cleared and maintained <br />3. @ pt. 100' from road at intersection of 1st bench and west collection <br />ditch: <br />'top width = 13'; bottom width = 26" ;depth = 28" <br />4. @ pt. near bend on southwest corner: <br />`top width = 14'; bottom width = 6' ;depth = 29.5"; riprapped <br />5. @ pt. near cross section JJ-JJ: <br />`top width ~ 16'; bottom width = 9' ;depth = 25.5"; riprapped <br />6. culvert Q: <br />'48" diameter CMP (30" required); inlet and outlet clear <br />E. East Underdrain: <br />Filter fabric visible at outlet. Toe bench construction was not evident but <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.