Laserfiche WebLink
• (Page 3) • <br />MINE ID / OR PROSPECTING ID # M-84-036 <br />INSPECTION DATE 09/12/96 INSPE OR`S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and s ggeeted corrective <br />actions) were identified during this inspection. The problems should a corrected by the <br />dates given, or they will become possible violations. The possible v olatione should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should a notified of all <br />corrective actions taken. <br />PR0BLEMSIPOSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. DMG requires that the Operator submit proof of topsoil <br />covering the process area by submitting a current <br />topsoil sample analysis taken from the area in <br />question, so that DMG may evaluate the need for further <br />material at the site and adequately calculate the <br />currently required bond; or submit proof of other <br />topsoil stockpiles at the site. This ie in accordance <br />with Rule 3.1.9(6) and 4.2.1(1) of the Construction <br />Materials Rules and Regulations. <br />Nov. 18 1996 <br />PB or P PB <br />TOPICS TS <br />PB or P' <br />TOPICS <br />PB or P <br />TOPICS <br />