Laserfiche WebLink
• i <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (5) <br />Subtotal (K): <br />L. DRILL ROLE/MONITORING YELL SEALING <br />Task <br />_____ No.~ <br />___I_.._ Task Description <br />__________________________________..______ ~ Cost (f) <br />_____...I_____~__, <br />Subtotal (U: <br />N. NI SCELLANEOUS RECLAMA7I ON TASKS <br />Task No.~ Task Description ~ Cost (f) <br />2 ~ De watering ~ f38, 000 <br />Demolition <br />7 ~ Seeding ~ 562,818 <br />Fencing <br />1 ~ Mob/Demob ~ (2,661 <br />Subtotal (M ): (103,479 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 5224,781 <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ )tam Description ~ Cost (f) <br />T. ~ Public Liability Insurance.... 1.550% of dir. ~ 53,484 <br />2. ~ Contractor's Performance BoM 0.975% of dir. ~ 52,192 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ (22,478 <br />4. ~ Job Superintendent.. <br />Subtotal (A): f28, 154 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): (252,934 <br />B. DMG PROJECT ADNINISTRATI ON E%PENSES <br />Item No.~ Item Description ~ Cost (S) <br />1. ~ Minerals Program Admin. Fee at S.OOX of cntr.~ (12,647 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (8): f12, 647 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 540,801 <br />TOTAL PERFORMANCE BOND AMOl1NT (direct plus indirect costs): (265,581 <br />