Laserfiche WebLink
<br />RECLANATi •ST SUMMARY cont'd •shre[ 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Tesk No.l Tesk Description I Cost (S) <br />-___--_- I ________________ ________________-________-____-__ I ____-_____-_ <br />I I <br />Subtotal (X ): <br />1. EARTHNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Tesk No.l Task Description I Cost (f) <br />------ I ------------------------------------------- I ------------ <br />I I <br />I I <br />Subtotal (1 ): <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description I Cost (E) <br />5 I Naul topsoil from stockpiles and dui at site to <br />I be spread <br />6 <br />Spread topsoil <br />587, 154 <br />59,432 <br />Subtotal (J ): 596,586 <br />