Laserfiche WebLink
page 2/2 Deserado C-81-018 <br />25 Feb 04 ~~ <br />Processing Waste (cont.): -Refuse pile RP-5a appeared to be stable at the time of <br />the inspection. The pile is being used to stockpile refuse during the winter months. <br />Most of the snow has melted off of the pile and could be seen running into pond 5a. <br />There did not appear to be any controlled runoff from the pile but, rather, sheet flow <br />over the pile. While this is an issue, the Division has already addressed this potential <br />problem with a stipulation to the permit. <br />Support Facilities: - -The B-Vent shaft area appeared to be stable and in good <br />condition at the time of the inspection. <br />- Both the slot storage area and the loadout appeared to be stable and in good <br />condition. <br />