My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC20287
DRMS
>
Back File Migration
>
Inspection
>
INSPEC20287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:21:06 PM
Creation date
11/18/2007 9:34:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977393
IBM Index Class Name
Inspection
Doc Date
8/6/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.' <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (S) <br />________I_________.,_______.._____~_________________________I____________ <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________________________________________________________________________ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description ~ Cost (E) <br />~ Demolition ~ 546,682 <br />Seeding ~ 561,412 <br />Fencing <br />Mob/Demob ~ 57,648 <br />Subtotal (M): 5109,742 <br />I =___________ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 5156,097 <br />_______ ___ <br />11. INDIRECT COSTS <br />___________ _______ ____________________________________________________ <br />___________________________________ _______ _______________ _______ ____ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 52,420 <br />2. ~ Contractor's Performance BoM 0.975% of dir. ~ 51,522 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 515,610 <br />4. ~ Job Superintendent.. <br />Subtotal (A): 519,557 <br />I =___________ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 5175,648 <br />____________ <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />', Item No.~ Item Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />', 1. ~ Minerals Program Aotni n. Fee a[ 5.00% of cntr.~ f8, 782 <br />________________________________________________________________________ <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): E8, 782 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 528,334 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 5184,430 <br />
The URL can be used to link to this page
Your browser does not support the video tag.